X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485091107000

Well Details

Well ID: 0485091107000
Loading map...
Location: 00/07-11-048-09W5/0
Location Alias: 00/07-11-48-09 W5M
Location Alias 2: 00/07-11-048-09 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 09
Section: 11
County/Municipality: Brazeau County
Well Name: AMOCO HB A-108 PEM 7-11-48-9
Operator Name: Obsidian Energy Ltd.
License Number: 0043320
License Date: 1972-08-18
License Status: Issued
Spud Date: 1972-09-19
Final Drill Date: 1972-09-26
Well Total Depth: 1687.70 m
Surface Hole Latitude: 53.125105
Surface Hole Longitude: -115.206340

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-08-18 Obtained License
1972-09-26 Finished Drilling
1972-09-26 Well Mode changed to Drilled and Cased
1972-09-27 Production Casing Operation Performed
1972-09-29 Perforation Treatment Performed - Jet Perforation
1972-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-09-30 Perforation Treatment Performed - Fractured
1972-11-04 Well Began Production
1972-11-04 Well Fluid changed to Crude Oil
1972-11-04 Well Mode changed to Pumping
1975-01-22 Perforation Treatment Performed - Condensate Squeeze
2000-06-21 Well Fluid changed to Crude Oil
2000-06-21 Well Mode changed to Suspended
2004-07-01 Well Log Performed
2004-08-29 Perforation Treatment Performed - Jet Perforation
2004-08-29 Well Log Performed
2004-08-31 Well Log Performed
2004-09-01 Perforation Treatment Performed - Remedial Casing
2004-09-02 Perforation Treatment Performed - Jet Perforation
2004-09-02 Well Log Performed
2004-09-14 Perforation Treatment Performed - Remedial Casing
2005-02-11 Well Log Performed
2005-02-17 Perforation Treatment Performed - Jet Perforation
2005-02-23 Well Log Performed
2005-02-25 Well Log Performed
2005-02-26 Perforation Treatment Performed - Cement Squeeze
2005-02-26 Perforation Treatment Performed - Remedial Casing
2005-02-26 Plug Back Performed
2005-02-26 Production Casing Operation Performed
2005-02-28 Perforation Treatment Performed - Jet Perforation
2005-02-28 Well Log Performed
2005-03-01 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-09-29 Perforation 1618.50 1621.20 13
2004-09-14 Remedial Casing Cementing 286.00 287.00 0
2005-02-17 Perforation 1300.00 1302.00 17
2005-02-26 Remedial Casing Cementing 1300.00 1302.00 0
2005-02-26 Cement Squeeze 1618.50 1631.90 0
2005-02-28 Perforation 1217.00 1217.10 1
1972-09-29 Perforation 1621.80 1624.90 13
1972-09-29 Perforation 1630.10 1631.90 13
1972-09-30 Acid Treatment 1618.50 1631.90 0
1972-09-30 Fracture 1618.50 1631.90 0
1975-01-22 Condensate Squeeze 1618.50 1631.90 0
2004-08-29 Perforation 384.00 385.00 17
2004-09-01 Remedial Casing Cementing 384.00 385.00 0
2004-09-02 Perforation 286.00 287.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1224 0.0 0.0 0.0
1973 8028 0.0 0.0 0.0
1974 8712 0.0 0.0 0.0
1975 8397 0.0 0.0 0.0
1976 8615 0.0 0.0 0.0
1977 8496 0.0 0.0 0.0
1978 8422 0.0 0.0 0.0
1979 8407 0.0 0.0 0.0
1980 8410 0.0 0.0 0.0
1981 8592 0.0 0.0 0.0
1982 8321 0.0 0.0 0.0
1983 8595 0.0 0.0 0.0
1984 8681 0.0 0.0 0.0
1985 8679 0.0 0.0 0.0
1986 8563 0.0 0.0 0.0
1987 8245 0.0 0.0 0.0
1988 8704 0.0 0.0 0.0
1989 8447 0.0 0.0 0.0
1990 8202 0.0 0.0 0.0
1991 8112 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 7702 0.0 0.0 0.0
1994 7079 0.0 0.0 0.0
1995 2088 0.0 0.0 0.0
1996 4175 0.0 0.0 0.0
1997 72 0.0 0.0 0.0

For data sources see[5]

References