X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485092316000

Well Details

Well ID: 0485092316000
Loading map...
Location: 00/16-23-048-09W5/0
Location Alias: 00/16-23-48-09 W5M
Location Alias 2: 00/16-23-048-09 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 09
Section: 23
County/Municipality: Brazeau County
Well Name: PAN AM HB A-11 PEM IN 16-23-48-9
Operator Name: Obsidian Energy Ltd.
License Number: 0008601
License Date: 1954-10-19
License Status: Suspension
Spud Date: 1954-10-19
Final Drill Date: 1954-11-03
Well Total Depth: 1609.30 m
Surface Hole Latitude: 53.161425
Surface Hole Longitude: -115.199347

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-10-19 Obtained License
1954-11-03 Finished Drilling
1954-11-03 Well Mode changed to Drilled and Cased
1954-11-05 Production Casing Operation Performed
1954-11-07 Perforation Treatment Performed - Open-Hole Completion
1954-11-14 Perforation Treatment Performed - Fractured
1954-11-21 Well Began Production
1954-11-21 Well Fluid changed to Crude Oil
1954-11-21 Well Mode changed to Flowing
1958-04-01 Well Began Injection
1958-04-01 Well Fluid changed to Water
1958-04-01 Well Type changed to Injection
1958-10-02 Perforation Treatment Performed - Acid Wash - No Pressure
1958-10-02 Perforation Treatment Performed - Fractured
1971-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-02 Well Fluid changed to Water
1996-04-02 Well Mode changed to Suspended
1996-04-02 Well Type changed to Injection
2004-07-23 Well Fluid changed to Water
2004-07-23 Well Type changed to Injection
2004-09-01 Well Fluid changed to Water
2004-09-01 Well Mode changed to Suspended
2004-09-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-07 Open Hole/Barefoot Completion 1580.10 1609.30 0
1954-11-14 Fracture 1580.10 1609.30 0
1958-10-02 Acid Wash 1580.10 1609.30 0
1958-10-02 Fracture 1580.10 1609.30 0
1971-10-26 Acid Treatment 1580.10 1609.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[5]

References