If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494063616030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.27965,"lon":-110.758161,"icon":""}]} |
Location: 03/16-36-049-06W4/0 | |
Location Alias: 03/16-36-49-06 W4M | |
Location Alias 2: 03/16-36-049-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 06 | |
Section: 36 | |
County/Municipality: County of Vermilion River | |
Well Name: SPL 4-1 HZ 103 VERMIL 16-36-49-6 | |
Operator Name: Spur Petroleum Ltd. | |
License Number: 0437080 | |
License Date: 2011-09-23 | |
License Status: Issued | |
Spud Date: 2011-10-02 | |
Final Drill Date: 2011-10-04 | |
Well Total Depth: 1752.00 m | |
Surface Hole Latitude: 53.279650 | |
Surface Hole Longitude: -110.758161 |
Date | Event |
---|---|
2011-06-13 | Well Log Performed |
2011-09-23 | Obtained License |
2011-10-02 | Surface Casing Operation Performed |
2011-10-03 | Direction Drilling Operation Performed - Horizontal |
2011-10-04 | Finished Drilling |
2011-10-04 | Well Mode changed to Drilled and Cased |
2011-10-05 | Production Casing Operation Performed |
2011-10-05 | Rig Released |
2011-10-06 | Perforation Treatment Performed - Jet Perforation |
2011-10-07 | Well Log Performed |
2011-10-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-08 | Well Began Production |
2011-12-08 | Well Fluid changed to Shale Gas Only |
2011-12-08 | Well Mode changed to Flowing |
2012-01-31 | Well Fluid changed to Shale Gas Only |
2012-01-31 | Well Mode changed to Suspended |
2013-04-15 | Well Fluid changed to Shale Gas Only |
2013-04-15 | Well Mode changed to Flowing |
2016-04-30 | Well Fluid changed to Shale Gas Only |
2016-04-30 | Well Mode changed to Suspended |
2017-02-08 | Well Fluid changed to Shale Gas Only |
2017-02-08 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-03 | 116.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-06 | Perforation | 1625.00 | 1625.50 | 20 |
2011-10-06 | Perforation | 810.00 | 810.50 | 20 |
2011-10-06 | Perforation | 705.00 | 705.50 | 20 |
2011-10-06 | Perforation | 600.00 | 600.50 | 20 |
2011-10-27 | Multi-Stage Fracture | 1625.00 | 1625.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 1538.00 | 1538.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 1450.00 | 1450.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 1363.00 | 1363.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 1274.00 | 1274.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 1187.00 | 1187.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 1102.00 | 1102.50 | 0 |
2011-10-06 | Perforation | 1538.00 | 1538.50 | 20 |
2011-10-27 | Multi-Stage Fracture | 1010.00 | 1010.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 810.00 | 810.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 705.00 | 705.50 | 0 |
2011-10-27 | Multi-Stage Fracture | 600.00 | 600.50 | 0 |
2011-10-06 | Perforation | 1450.00 | 1450.50 | 20 |
2011-10-06 | Perforation | 1363.00 | 1363.50 | 20 |
2011-10-06 | Perforation | 1274.00 | 1274.50 | 20 |
2011-10-06 | Perforation | 1187.00 | 1187.50 | 20 |
2011-10-06 | Perforation | 1102.00 | 1102.50 | 20 |
2011-10-06 | Perforation | 1010.00 | 1010.50 | 20 |
2011-10-06 | Perforation | 907.00 | 907.50 | 20 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 552 | 0.0 | 0.0 | 0.0 |
2013 | 6137 | 0.0 | 0.0 | 0.0 |
2014 | 8435 | 0.0 | 0.0 | 0.0 |
2015 | 8698 | 0.0 | 0.0 | 0.0 |
2016 | 2903 | 0.0 | 0.0 | 0.0 |
2017 | 7847 | 0.0 | 0.0 | 0.0 |
2018 | 8159 | 0.0 | 0.0 | 0.0 |
2019 | 7839 | 0.0 | 0.0 | 0.0 |
2020 | 2139 | 0.0 | 0.0 | 0.0 |
For data sources see[6]