X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494212304000

Well Details

Well ID: 0494212304000
Loading map...
Location: 00/04-23-049-21W4/0
Location Alias: 00/04-23-49-21 W4M
Location Alias 2: 00/04-23-049-21 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 21
Section: 23
County/Municipality: Camrose County
Well Name: CABRE PCP JOARCAM 4-23-49-21
Operator Name: Enerplus Corporation
License Number: 0100036
License Date: 1983-01-05
License Status: Issued
Spud Date: 1983-08-06
Final Drill Date: 1983-08-12
Well Total Depth: 1325.00 m
Surface Hole Latitude: 53.238953
Surface Hole Longitude: -112.970925

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-01-05 Obtained License
1983-08-12 Finished Drilling
1983-08-13 Drill Stem Test Performed
1983-08-14 Drill Stem Test Performed
1983-08-15 Production Casing Operation Performed
1983-08-25 Perforation Treatment Performed - Jet Perforation
1983-08-26 Perforation Treatment Performed - Jet Perforation
1983-08-28 Well Mode changed to Drilled and Cased
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Gas
1993-03-01 Well Mode changed to Flowing
1998-08-01 Well Began Injection
1998-08-01 Well Fluid changed to Gas
1998-08-01 Well Type changed to Injection
2000-06-22 Well Log Performed
2000-06-23 Perforation Treatment Performed - Cement Squeeze
2000-06-23 Plug Back Performed
2000-06-23 Well Fluid changed to Gas
2000-06-23 Well Type changed to Injection
2000-07-05 Perforation Treatment Performed - Jet Perforation
2000-07-05 Well Log Performed
2000-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-25 Well Fluid changed to Gas
2007-06-25 Well Mode changed to Flowing
2014-03-18 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-25 Perforation 997.00 1000.50 10
1983-08-26 Perforation 988.00 990.50 10
2000-06-23 Cement Squeeze 988.00 990.50 0
2000-07-05 Perforation 997.00 1001.00 13
2000-07-06 Acid Treatment 997.00 1001.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6536 0.0 0.0 0.0
1994 4684 0.0 0.0 0.0
1995 8488 0.0 0.0 0.0
1996 7290 0.0 0.0 0.0
1997 3136 0.0 0.0 0.0
1998 95 0.0 0.0 0.0
1999 101 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 5061 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8638 0.0 0.0 0.0
2011 8563 0.0 0.0 0.0
2012 8774 0.0 0.0 0.0
2013 8680 0.0 0.0 0.0
2014 272 0.0 0.0 0.0

For data sources see[5]

References