X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494212706000

Well Details

Well ID: 0494212706000
Loading map...
Location: 00/06-27-049-21W4/0
Location Alias: 00/06-27-49-21 W4M
Location Alias 2: 00/06-27-049-21 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 21
Section: 27
County/Municipality: Camrose County
Well Name: CABRE PCP JOARCAM 6-27-49-21
Operator Name: Enerplus Corporation
License Number: 0101731
License Date: 1983-06-14
License Status: Abandoned
Spud Date: 1983-07-13
Final Drill Date: 1983-07-16
Well Total Depth: 1266.00 m
Surface Hole Latitude: 53.257405
Surface Hole Longitude: -112.992520

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-06-14 Obtained License
1983-07-16 Finished Drilling
1983-07-17 Drill Stem Test Performed
1983-07-17 Well Log Performed
1983-07-18 Drill Stem Test Performed
1983-07-19 Production Casing Operation Performed
1983-08-17 Perforation Treatment Performed - Jet Perforation
1983-08-18 Perforation Treatment Performed - Cement Squeeze
1983-08-21 Perforation Treatment Performed - Jet Perforation
1983-08-23 Well Mode changed to Drilled and Cased
1990-11-17 Well Began Production
1990-11-17 Well Fluid changed to Gas
1990-11-17 Well Mode changed to Flowing
1993-02-28 Well Fluid changed to Gas
1993-02-28 Well Mode changed to Suspended
1993-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-12 Plug Back Performed
1993-03-12 Well Fluid changed to Gas
1993-03-12 Well Mode changed to Abandoned Zone
1993-03-13 Well Log Performed
1993-03-14 Perforation Treatment Performed - Jet Perforation
2001-02-28 Perforation Treatment Performed - Jet Perforation
2001-02-28 Well Log Performed
2001-03-12 Well Log Performed
2001-06-30 Well Log Performed
2003-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-05 Plug Back Performed
2003-07-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-17 Perforation 1193.00 1193.50 4
1983-08-18 Cement Squeeze 1193.00 1193.50 0
1983-08-21 Perforation 1187.00 1190.00 7
1993-03-12 Packing Device Capped w/Cement 1170.00 1178.00 0
1993-03-14 Perforation 993.50 997.00 13
2001-02-28 Perforation 993.50 997.00 17
2003-02-05 Packing Device Capped w/Cement 972.00 980.00 0
2003-02-05 Packing Device Capped w/Cement 115.00 123.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 406 0.0 0.0 0.0
1991 1982 0.0 0.0 0.0

For data sources see[5]

References