If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495053602020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.280243,"lon":-114.599719,"icon":""}]} |
Location: 02/02-36-049-05W5/0 | |
Location Alias: 02/02-36-49-05 W5M | |
Location Alias 2: 02/02-36-049-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 05 | |
Section: 36 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 102 HZ PEMBINA 2-36-49-5 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0479082 | |
License Date: 2016-02-23 | |
License Status: Issued | |
Spud Date: 2016-03-03 | |
Final Drill Date: 2016-03-08 | |
Well Total Depth: 2846.00 m | |
Surface Hole Latitude: 53.280243 | |
Surface Hole Longitude: -114.599719 |
Date | Event |
---|---|
2016-02-23 | Obtained License |
2016-03-04 | Surface Casing Operation Performed |
2016-03-05 | Direction Drilling Operation Performed - Deviate |
2016-03-05 | Direction Drilling Operation Performed - Horizontal |
2016-03-07 | Well Log Performed |
2016-03-08 | Finished Drilling |
2016-03-08 | Production Casing Operation Performed |
2016-03-08 | Rig Released |
2016-03-08 | Well Mode changed to Drilled and Cased |
2016-04-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-04-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-04-09 | Well Began Production |
2016-04-09 | Well Fluid changed to Crude Oil |
2016-04-09 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-03-03 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-03-05 | 829.90 | Deviate (5 - 79 degrees) |
2016-03-05 | 1376.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-04-03 | Multi-Stage Fracture | 2792.80 | 2792.90 | 0 |
2016-04-04 | Multi-Stage Fracture | 2291.40 | 2292.20 | 0 |
2016-04-04 | Multi-Stage Fracture | 2234.30 | 2235.10 | 0 |
2016-04-04 | Multi-Stage Fracture | 2177.30 | 2178.10 | 0 |
2016-04-04 | Multi-Stage Fracture | 2121.10 | 2121.90 | 0 |
2016-04-04 | Multi-Stage Fracture | 2068.60 | 2069.40 | 0 |
2016-04-04 | Multi-Stage Fracture | 2020.70 | 2021.50 | 0 |
2016-04-04 | Multi-Stage Fracture | 1972.80 | 1973.60 | 0 |
2016-04-04 | Multi-Stage Fracture | 1925.00 | 1925.80 | 0 |
2016-04-04 | Multi-Stage Fracture | 1870.40 | 1871.20 | 0 |
2016-04-04 | Multi-Stage Fracture | 1813.50 | 1814.30 | 0 |
2016-04-03 | Multi-Stage Fracture | 2748.00 | 2748.80 | 0 |
2016-04-04 | Multi-Stage Fracture | 1757.10 | 1757.90 | 0 |
2016-04-04 | Multi-Stage Fracture | 1700.00 | 1700.80 | 0 |
2016-04-04 | Multi-Stage Fracture | 1643.40 | 1644.20 | 0 |
2016-04-04 | Multi-Stage Fracture | 1588.20 | 1589.00 | 0 |
2016-04-04 | Multi-Stage Fracture | 1531.10 | 1531.90 | 0 |
2016-04-04 | Multi-Stage Fracture | 1474.10 | 1474.90 | 0 |
2016-04-04 | Multi-Stage Fracture | 1416.90 | 1417.70 | 0 |
2016-04-03 | Multi-Stage Fracture | 2691.00 | 2691.80 | 0 |
2016-04-04 | Multi-Stage Fracture | 2633.90 | 2634.70 | 0 |
2016-04-04 | Multi-Stage Fracture | 2576.80 | 2577.60 | 0 |
2016-04-04 | Multi-Stage Fracture | 2519.70 | 2520.50 | 0 |
2016-04-04 | Multi-Stage Fracture | 2462.70 | 2463.50 | 0 |
2016-04-04 | Multi-Stage Fracture | 2405.60 | 2406.40 | 0 |
2016-04-04 | Multi-Stage Fracture | 2348.50 | 2349.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-04-03 | 2016-04-04 | 1,208 | 2,062 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.1311 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 11.6028 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 5.604 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0103 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0103 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0103 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0103 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0103 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1828 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1828 | N/A | ||||
FR-18 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0855 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0855 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0855 | N/A | ||||
S-17 | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0448 | N/A | |
water | Not Available | 100 | 0.0448 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-03-06 | 2016-04-01 | Oilfield Produced Water | 2061 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 6089 | 0.0 | 0.0 | 0.0 |
2017 | 8441 | 0.0 | 0.0 | 0.0 |
2018 | 8311 | 0.0 | 0.0 | 0.0 |
2019 | 8423 | 0.0 | 0.0 | 0.0 |
2020 | 2124 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-03-08 | No Incident Encountered | 0.00 | 0.00 |
2016-04-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]