X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495060411000

Well Details

Well ID: 0495060411000
Loading map...
Location: 00/11-04-049-06W5/0
Location Alias: 00/11-04-49-06 W5M
Location Alias 2: 00/11-04-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 04
County/Municipality: Brazeau County
Well Name: ARC PEMBINA 11-4-49-6
Operator Name: ARC Resources Ltd.
License Number: 0067577
License Date: 1977-12-22
License Status: Suspension
Spud Date: 1978-05-25
Final Drill Date: 1978-05-26
Well Total Depth: 1091.20 m
Surface Hole Latitude: 53.201892
Surface Hole Longitude: -114.822126

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-22 Obtained License
1978-05-26 Drill Stem Test Performed
1978-05-26 Finished Drilling
1978-05-26 Well Log Performed
1978-05-27 Drill Stem Test Performed
1978-05-28 Drill Stem Test Performed
1978-05-29 Production Casing Operation Performed
1978-05-30 Well Mode changed to Drilled and Cased
1978-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-04 Perforation Treatment Performed - Jet Perforation
1978-08-05 Perforation Treatment Performed - Fractured
1978-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-07 Perforation Treatment Performed - Jet Perforation
1978-08-08 Perforation Treatment Performed - Fractured
1978-12-27 Well Began Production
1978-12-27 Well Fluid changed to Crude Oil
1978-12-27 Well Mode changed to Pumping
1982-03-16 Well Fluid changed to Crude Oil
1982-03-16 Well Mode changed to Suspended
1985-08-01 Well Fluid changed to Crude Oil
1985-08-01 Well Mode changed to Pumping
1990-01-23 Perforation Treatment Performed - Jet Perforation
2017-05-01 Well Fluid changed to Crude Oil
2017-05-01 Well Mode changed to Pumping
2019-11-01 Well Fluid changed to Crude Oil
2019-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-04 Perforation 1063.80 1065.60 7
1978-08-04 Acid Treatment 1063.80 1065.60 0
1978-08-05 Fracture 1063.80 1065.60 0
1978-08-07 Perforation 968.30 971.70 7
1978-08-07 Acid Treatment 968.30 971.70 0
1978-08-08 Fracture 968.30 971.70 0
1990-01-23 Perforation 968.40 971.70 13
1990-01-23 Perforation 1061.30 1065.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 94 0.0 0.0 0.0
1979 5417 0.0 0.0 0.0
1980 7751 0.0 0.0 0.0
1981 8544 0.0 0.0 0.0
1985 2592 0.0 0.0 0.0
1986 7717 0.0 0.0 0.0
1987 8663 0.0 0.0 0.0
1988 8619 0.0 0.0 0.0
1989 8304 0.0 0.0 0.0
1990 8039 0.0 0.0 0.0
1991 8520 0.0 0.0 0.0
1992 8448 0.0 0.0 0.0
1993 7991 0.0 0.0 0.0
1994 8495 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 8639 0.0 0.0 0.0
1997 7320 0.0 0.0 0.0
1998 8663 0.0 0.0 0.0
1999 8206 0.0 0.0 0.0
2000 8602 0.0 0.0 0.0
2001 8521 0.0 0.0 0.0
2002 8655 0.0 0.0 0.0
2003 6919 0.0 0.0 0.0
2004 7956 0.0 0.0 0.0
2005 7391 0.0 0.0 0.0
2006 8255 0.0 0.0 0.0
2007 8687 0.0 0.0 0.0
2008 8031 0.0 0.0 0.0
2009 8391 0.0 0.0 0.0
2010 8481 0.0 0.0 0.0
2011 8572 0.0 0.0 0.0
2012 8135 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 8132 0.0 0.0 0.0
2015 8474 0.0 0.0 0.0
2016 8662 0.0 0.0 0.0
2017 8630 0.0 0.0 0.0
2018 3548 0.0 0.0 0.0

For data sources see[5]

References