X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495092607000

Well Details

Well ID: 0495092607000
Loading map...
Location: 00/07-26-049-09W5/0
Location Alias: 00/07-26-49-09 W5M
Location Alias 2: 00/07-26-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 26
County/Municipality: Brazeau County
Well Name: AMOCO HB PEMBINA 7-26-49-9
Operator Name: Obsidian Energy Ltd.
License Number: 0071846
License Date: 1978-09-08
License Status: Suspension
Spud Date: 1978-10-03
Final Drill Date: 1978-12-02
Well Total Depth: 2660.00 m
Surface Hole Latitude: 53.255181
Surface Hole Longitude: -115.203707

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-08 Obtained License
1978-11-19 Production Casing Operation Performed
1978-12-02 Finished Drilling
1979-03-12 Perforation Treatment Performed - Jet Perforation
1979-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-15 Perforation Treatment Performed - Cement Squeeze
1979-03-16 Perforation Treatment Performed - Jet Perforation
1979-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-19 Perforation Treatment Performed - Cement Squeeze
1979-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-22 Perforation Treatment Performed - Jet Perforation
1979-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-24 Perforation Treatment Performed - Cement Squeeze
1979-03-27 Perforation Treatment Performed - Jet Perforation
1979-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-30 Perforation Treatment Performed - Cement Squeeze
1979-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-31 Well Mode changed to Drilled and Cased

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-12 Perforation 2078.00 2082.00 7
1979-03-24 Cement Squeeze 1970.50 1978.50 0
1979-03-24 Packing Device Capped w/Cement 1941.80 1950.00 0
1979-03-27 Perforation 1803.50 1807.00 7
1979-03-28 Acid Treatment 1803.50 1807.00 0
1979-03-30 Cement Squeeze 1803.50 1807.00 0
1979-03-31 Packing Device Capped w/Cement 1763.70 1780.00 0
1979-03-15 Cement Squeeze 2078.00 2082.00 0
1979-03-15 Packing Device Capped w/Cement 2047.60 2060.00 0
1979-03-16 Perforation 2043.00 2047.00 7
1979-03-18 Acid Treatment 2043.00 2047.00 0
1979-03-19 Cement Squeeze 2043.00 2047.00 0
1979-03-20 Packing Device Capped w/Cement 2013.90 2025.00 0
1979-03-22 Perforation 1970.50 1978.50 7
1979-03-23 Acid Treatment 1970.50 1978.50 0

For data sources see[4]



References