X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495100516000

Well Details

Well ID: 0495100516000
Loading map...
Location: 00/16-05-049-10W5/0
Location Alias: 00/16-05-49-10 W5M
Location Alias 2: 00/16-05-049-10 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 10
Section: 05
County/Municipality: Brazeau County
Well Name: PENN WEST PEMBINA 16-5-49-10
Operator Name: Obsidian Energy Ltd.
License Number: 0011484
License Date: 1956-05-29
License Status: Issued
Spud Date: 1956-08-23
Final Drill Date: 1956-09-02
Well Total Depth: 1758.70 m
Surface Hole Latitude: 53.205199
Surface Hole Longitude: -115.418725

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-05-29 Obtained License
1956-09-02 Finished Drilling
1956-09-02 Well Mode changed to Drilled and Cased
1956-09-03 Production Casing Operation Performed
1956-09-05 Perforation Treatment Performed - Bullet Perforation
1956-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-09-19 Perforation Treatment Performed - Fractured
1956-09-30 Well Began Production
1956-09-30 Well Fluid changed to Crude Oil
1956-09-30 Well Mode changed to Flowing
1956-10-25 Well Fluid changed to Crude Oil
1956-10-25 Well Mode changed to Pumping
1957-06-26 Perforation Treatment Performed - Fractured
1966-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-05 Perforation Treatment Performed - Fractured
1996-10-22 Perforation Treatment Performed - Jet Perforation
1996-10-22 Well Log Performed
1996-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-23 Well Log Performed
1996-10-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-09-05 Bullet Perforation 1739.20 1740.40 26
1996-10-23 Acid Treatment 1729.40 1740.40 0
1996-10-29 Fracture 1729.40 1740.40 0
1956-09-05 Bullet Perforation 1735.20 1739.20 26
1956-09-05 Bullet Perforation 1729.40 1734.90 26
1956-09-13 Acid Treatment 1729.40 1740.40 0
1956-09-19 Fracture 1729.40 1740.40 0
1957-06-26 Fracture 1729.40 1740.40 0
1966-11-05 Acid Treatment 1729.40 1734.00 0
1966-11-05 Fracture 1729.40 1734.00 0
1996-10-22 Perforation 1730.00 1736.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8043 0.0 0.0 0.0
1968 8610 0.0 0.0 0.0
1969 8035 0.0 0.0 0.0
1970 8543 0.0 0.0 0.0
1971 8594 0.0 0.0 0.0
1972 8266 0.0 0.0 0.0
1973 8705 0.0 0.0 0.0
1974 8595 0.0 0.0 0.0
1975 8599 0.0 0.0 0.0
1976 8717 0.0 0.0 0.0
1977 8615 0.0 0.0 0.0
1978 8674 0.0 0.0 0.0
1979 8677 0.0 0.0 0.0
1980 8711 0.0 0.0 0.0
1981 8693 0.0 0.0 0.0
1982 8573 0.0 0.0 0.0
1983 8563 0.0 0.0 0.0
1984 8465 0.0 0.0 0.0
1985 8709 0.0 0.0 0.0
1986 8420 0.0 0.0 0.0
1987 8647 0.0 0.0 0.0
1988 7920 0.0 0.0 0.0
1989 8318 0.0 0.0 0.0
1990 5504 0.0 0.0 0.0
1991 7987 0.0 0.0 0.0
1992 8151 0.0 0.0 0.0
1993 7840 0.0 0.0 0.0
1994 7920 0.0 0.0 0.0
1995 8031 0.0 0.0 0.0
1996 6683 0.0 0.0 0.0
1997 8336 0.0 0.0 0.0
1998 8492 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8523 0.0 0.0 0.0
2001 8384 0.0 0.0 0.0
2002 8406 0.0 0.0 0.0
2003 8372 0.0 0.0 0.0
2004 7374 0.0 0.0 0.0
2005 7285 0.0 0.0 0.0
2006 8423 0.0 0.0 0.0
2007 7408 0.0 0.0 0.0
2008 6983 0.0 0.0 0.0
2009 8039 0.0 0.0 0.0
2010 2937 0.0 0.0 0.0
2011 3409 0.0 0.0 0.0
2012 6705 0.0 0.0 0.0
2013 7078 0.0 0.0 0.0
2014 7449 0.0 0.0 0.0
2015 8459 0.0 0.0 0.0
2016 8703 0.0 0.0 0.0
2017 8529 0.0 0.0 0.0
2018 6749 0.0 0.0 0.0
2019 5268 0.0 0.0 0.0

For data sources see[5]

References