X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495103514003

Well Details

Well ID: 0495103514003
Loading map...
Location: 00/14-35-049-10W5/3
Location Alias: 00/14-35-49-10 W5M
Location Alias 2: 00/14-35-049-10 W5/03
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 10
Section: 35
County/Municipality: Brazeau County
Well Name: PENN WEST PEMBINA 14-35-49-10
Operator Name: Obsidian Energy Ltd.
License Number: 0015516
License Date: 1958-07-08
License Status: Issued
Spud Date: 1958-07-22
Final Drill Date: 1958-07-30
Well Total Depth: 1703.80 m
Surface Hole Latitude: 53.277843
Surface Hole Longitude: -115.357175

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-07-08 Obtained License
1958-07-30 Finished Drilling
1958-07-30 Well Mode changed to Drilled and Cased
1958-07-31 Production Casing Operation Performed
1958-08-02 Perforation Treatment Performed - Bullet Perforation
1958-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-08-17 Perforation Treatment Performed - Bullet Perforation
1988-05-18 Perforation Treatment Performed - Jet Perforation
1988-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-25 Perforation Treatment Performed - Jet Perforation
1988-05-29 Perforation Treatment Performed - Cement Squeeze
1988-05-29 Plug Back Performed
1989-05-17 Well Log Performed
1989-05-25 Well Log Performed
1995-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-29 Plug Back Performed
1995-07-29 Well Log Performed
1995-07-30 Perforation Treatment Performed - Jet Perforation
1995-07-30 Well Log Performed
1995-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-24 Plug Back Performed
1997-11-25 Perforation Treatment Performed - Jet Perforation
1997-12-01 Well Began Production
1997-12-01 Well Fluid changed to Gas
1997-12-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-08-02 Bullet Perforation 1657.50 1661.20 13
1995-07-29 Packing Device Capped w/Cement 1642.00 1650.00 0
1995-07-30 Perforation 1214.50 1219.30 13
1995-08-04 Acid Treatment 1214.50 1219.30 0
1997-11-24 Packing Device Capped w/Cement 1201.00 1209.00 0
1997-11-25 Perforation 566.00 569.00 13
1958-08-17 Bullet Perforation 1657.50 1661.20 13
1958-08-17 Acid Treatment 1657.50 1661.20 0
1988-05-18 Perforation 1316.10 1321.40 13
1988-05-19 Acid Treatment 1316.10 1321.40 0
1988-05-25 Perforation 1307.60 1311.80 13
1988-05-25 Acid Treatment 1307.60 1311.80 0
1988-05-29 Cement Squeeze 1307.60 1321.40 0
1995-07-29 Packing Device Capped w/Cement 1288.00 1295.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 602 0.0 0.0 0.0
1998 8503 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8399 0.0 0.0 0.0
2001 8615 0.0 0.0 0.0
2002 7852 0.0 0.0 0.0
2003 8615 0.0 0.0 0.0
2004 8145 0.0 0.0 0.0
2005 8691 0.0 0.0 0.0
2006 7651 0.0 0.0 0.0
2007 8687 0.0 0.0 0.0
2008 8638 0.0 0.0 0.0
2009 8710 0.0 0.0 0.0
2010 7655 0.0 0.0 0.0
2011 8063 0.0 0.0 0.0
2012 8582 0.0 0.0 0.0
2013 7973 0.0 0.0 0.0
2014 7895 0.0 0.0 0.0
2015 8351 0.0 0.0 0.0
2016 5904 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7655 0.0 0.0 0.0

For data sources see[5]

References