X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495112016000

Well Details

Well ID: 0495112016000
Loading map...
Location: 00/16-20-049-11W5/0
Location Alias: 00/16-20-49-11 W5M
Location Alias 2: 00/16-20-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 20
County/Municipality: Brazeau County
Well Name: WHITECAP PEMBINA 16-20-49-11
Operator Name: Whitecap Resources Inc.
License Number: 0017222
License Date: 1959-06-10
License Status: Issued
Spud Date: 1959-07-15
Final Drill Date: 1959-07-26
Well Total Depth: 1802.90 m
Surface Hole Latitude: 53.248739
Surface Hole Longitude: -115.565074

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-10 Obtained License
1959-07-26 Finished Drilling
1959-07-26 Well Mode changed to Drilled and Cased
1959-07-27 Production Casing Operation Performed
1959-07-29 Perforation Treatment Performed - Jet Perforation
1959-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-31 Perforation Treatment Performed - Fractured
1959-08-06 Well Began Production
1959-08-06 Well Fluid changed to Crude Oil
1959-08-06 Well Mode changed to Flowing
1959-09-04 Well Fluid changed to Crude Oil
1959-09-04 Well Mode changed to Pumping
1967-10-11 Perforation Treatment Performed - Acid Wash - No Pressure
1967-10-11 Perforation Treatment Performed - Fractured
2000-08-02 Perforation Treatment Performed - Jet Perforation
2000-08-02 Well Log Performed
2000-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-29 Perforation 1776.70 1777.90 7
1959-07-29 Perforation 1778.80 1779.70 7
1959-07-31 Acid Treatment 1776.70 1779.70 0
1959-07-31 Fracture 1776.70 1779.70 0
1967-10-11 Fracture 1776.70 1779.70 0
1967-10-11 Acid Wash 1776.70 1779.70 0
2000-08-02 Perforation 1777.00 1780.00 13
2000-08-03 Acid Treatment 1776.90 1779.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8177 0.0 0.0 0.0
1968 8701 0.0 0.0 0.0
1969 7907 0.0 0.0 0.0
1970 8530 0.0 0.0 0.0
1971 8335 0.0 0.0 0.0
1972 8272 0.0 0.0 0.0
1973 8694 0.0 0.0 0.0
1974 8608 0.0 0.0 0.0
1975 8562 0.0 0.0 0.0
1976 8490 0.0 0.0 0.0
1977 8683 0.0 0.0 0.0
1978 8483 0.0 0.0 0.0
1979 8548 0.0 0.0 0.0
1980 8444 0.0 0.0 0.0
1981 8299 0.0 0.0 0.0
1982 8283 0.0 0.0 0.0
1983 8543 0.0 0.0 0.0
1984 8360 0.0 0.0 0.0
1985 8387 0.0 0.0 0.0
1986 7475 0.0 0.0 0.0
1987 8395 0.0 0.0 0.0
1988 8635 0.0 0.0 0.0
1989 8412 0.0 0.0 0.0
1990 8562 0.0 0.0 0.0
1991 8447 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 7160 0.0 0.0 0.0
1994 8615 0.0 0.0 0.0
1995 8231 0.0 0.0 0.0
1996 8663 0.0 0.0 0.0
1997 8531 0.0 0.0 0.0
1998 8378 0.0 0.0 0.0
1999 8496 0.0 0.0 0.0
2000 8111 0.0 0.0 0.0
2001 8741 0.0 0.0 0.0
2002 8615 0.0 0.0 0.0
2003 8640 0.0 0.0 0.0
2004 7665 0.0 0.0 0.0
2005 8663 0.0 0.0 0.0
2006 7524 0.0 0.0 0.0
2007 8520 0.0 0.0 0.0
2008 6072 0.0 0.0 0.0
2009 1200 0.0 0.0 0.0
2010 4026 0.0 0.0 0.0
2011 5732 0.0 0.0 0.0
2012 6639 0.0 0.0 0.0
2013 7048 0.0 0.0 0.0
2014 8030 0.0 0.0 0.0
2015 8519 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2083 0.0 0.0 0.0

For data sources see[5]

References