X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515080812000

Well Details

Well ID: 0515080812000
Loading map...
Location: 00/12-08-051-08W5/0
Location Alias: 00/12-08-51-08 W5M
Location Alias 2: 00/12-08-051-08 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 08
Section: 08
County/Municipality: Yellowhead County
Well Name: ANDERSON BIGORAY 12-8-51-8
Operator Name: Scollard Energy Ltd.
License Number: 0148274
License Date: 1991-03-07
License Status: Abandoned
Spud Date: 1991-03-17
Final Drill Date: 1991-03-25
Well Total Depth: 1932.00 m
Surface Hole Latitude: 53.391830
Surface Hole Longitude: -115.151011

For data sources see[1][2]

Well History

Date Event
1991-03-07 Obtained License
1991-03-17 Lost Circulation Occurred
1991-03-19 Surface Casing Operation Performed
1991-03-25 Finished Drilling
1991-03-27 Well Log Performed
1991-03-29 Production Casing Operation Performed
1991-03-29 Rig Released
1992-01-03 Well Log Performed
1992-01-04 Perforation Treatment Performed - Fractured
1992-01-04 Perforation Treatment Performed - Jet Perforation
1992-01-05 Perforation Treatment Performed - Fractured
1992-01-20 Well Mode changed to Drilled and Cased
1992-03-06 Well Began Production
1992-03-06 Well Fluid changed to Gas
1992-03-06 Well Mode changed to Flowing
1996-06-06 Perforation Treatment Performed - Jet Perforation
1996-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-02-11 Well Fluid changed to Gas
2008-02-11 Well Mode changed to Pumping
2017-02-01 Well Fluid changed to Gas
2017-02-01 Well Mode changed to Suspended
2019-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-18 Plug Back Performed
2019-12-18 Well Log Performed
2019-12-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-01-04 Perforation 1867.00 1873.00 13
1992-01-04 Fracture 1867.00 1873.00 0
1992-01-05 Fracture 1867.00 1873.00 0
1996-06-06 Perforation 1866.50 1875.00 18
1996-06-08 Acid Treatment 1866.50 1875.00 0
2019-12-18 Packing Device Capped w/Cement 1852.00 1860.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 6539 0.0 0.0 0.0
1993 7761 0.0 0.0 0.0
1994 8311 0.0 0.0 0.0
1995 8115 0.0 0.0 0.0
1996 7229 0.0 0.0 0.0
1997 8655 0.0 0.0 0.0
1998 8439 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8510 0.0 0.0 0.0
2001 8600 0.0 0.0 0.0
2002 8592 0.0 0.0 0.0
2003 8592 0.0 0.0 0.0
2004 7346 0.0 0.0 0.0
2005 8590 0.0 0.0 0.0
2006 8458 0.0 0.0 0.0
2007 7780 0.0 0.0 0.0
2008 8082 0.0 0.0 0.0
2009 8415 0.0 0.0 0.0
2010 8108 0.0 0.0 0.0
2011 7859 0.0 0.0 0.0
2012 8555 0.0 0.0 0.0
2013 7150 0.0 0.0 0.0
2014 5974 0.0 0.0 0.0
2015 6760 0.0 0.0 0.0
2016 122 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-03-17 Lost Circulation 27.00 210.00
2019-12-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References