X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515090905023

Well Details

Well ID: 0515090905023
Loading map...
Location: 02/05-09-051-09W5/3
Location Alias: 02/05-09-51-09 W5M
Location Alias 2: 02/05-09-051-09 W5/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 09
Section: 09
County/Municipality: Yellowhead County
Well Name: TALLGRASS BIGORAY 5-9-51-9
Operator Name: Tallgrass Energy Corp.
License Number: 0083813
License Date: 1980-06-27
License Status: Suspension
Spud Date: 1980-07-26
Final Drill Date: 1980-09-09
Well Total Depth: 2625.00 m
Surface Hole Latitude: 53.388267
Surface Hole Longitude: -115.276146

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-27 Obtained License
1980-08-22 Well Log Performed
1980-08-26 Lost Circulation Occurred
1980-08-28 Liner Casing Operation Performed
1980-09-09 Finished Drilling
1980-09-09 Perforation Treatment Performed - Open-Hole Completion
1980-09-09 Well Mode changed to Drilled and Cased
1981-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-23 Perforation Treatment Performed - Cement Squeeze
1981-02-27 Perforation Treatment Performed - Jet Perforation
1981-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-05 Perforation Treatment Performed - Cement Squeeze
1981-03-07 Perforation Treatment Performed - Cement Squeeze
1981-03-11 Perforation Treatment Performed - Jet Perforation
1981-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-28 Perforation Treatment Performed - Jet Perforation
1997-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-29 Perforation Treatment Performed - Cement Squeeze
1998-08-03 Well Log Performed
2000-04-04 Perforation Treatment Performed - Jet Perforation
2000-04-04 Well Log Performed
2000-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-08 Plug Back Performed
2000-04-10 Perforation Treatment Performed - Jet Perforation
2000-04-10 Well Log Performed
2000-04-10 Well Mode changed to Drilled and Cased
2000-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-18 Well Began Production
2000-04-18 Well Fluid changed to Crude Oil
2000-04-18 Well Mode changed to Pumping
2008-02-01 Well Fluid changed to Crude Oil
2008-02-01 Well Mode changed to Suspended
2017-02-17 Well Log Performed
2017-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-21 Perforation Treatment Performed - Jet Perforation
2017-02-21 Plug Back Performed
2017-02-21 Well Fluid changed to Crude Oil
2017-02-21 Well Log Performed
2017-02-21 Well Mode changed to Abandoned Zone
2017-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-22 Perforation Treatment Performed - Cement Squeeze
2017-02-22 Perforation Treatment Performed - Jet Perforation
2017-02-22 Plug Back Performed
2017-02-22 Well Log Performed
2017-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-23 Perforation Treatment Performed - Cement Squeeze
2017-02-23 Perforation Treatment Performed - Jet Perforation
2017-02-23 Plug Back Performed
2017-02-23 Well Log Performed
2017-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-24 Perforation Treatment Performed - Cement Squeeze
2017-02-24 Perforation Treatment Performed - Jet Perforation
2017-02-24 Plug Back Performed
2017-02-24 Well Log Performed
2017-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-25 Perforation Treatment Performed - Cement Squeeze
2017-02-25 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-09 Open Hole/Barefoot Completion 2460.00 2625.00 0
1981-03-07 Cement Squeeze 2528.00 2546.00 0
1981-03-11 Perforation 2528.00 2531.00 7
1981-03-11 Perforation 2548.00 2550.00 7
1981-03-13 Acid Treatment 2528.00 2550.00 0
1997-12-28 Perforation 1472.00 1473.30 13
1997-12-29 Acid Treatment 1472.00 1473.30 0
1998-07-29 Cement Squeeze 1472.00 1473.30 0
2000-04-04 Perforation 2486.00 2488.00 17
2000-04-04 Perforation 2480.00 2483.50 17
2000-04-04 Perforation 2467.50 2469.00 17
1981-02-03 Acid Treatment 2460.00 2625.00 0
2000-04-05 Acid Treatment 2467.50 2488.00 0
2000-04-08 Packing Device Capped w/Cement 2452.00 2460.00 0
2000-04-10 Perforation 2421.00 2422.50 17
2000-04-10 Perforation 2421.00 2435.00 17
2000-04-10 Perforation 2436.00 2437.00 17
2000-04-11 Acid Treatment 2421.00 2437.00 0
2017-02-21 Packing Device Capped w/Cement 2399.00 2407.00 0
2017-02-21 Perforation 894.00 895.00 17
2017-02-21 Packing Device Capped w/Cement 1457.00 1465.00 0
2017-02-22 Packing Device Capped w/Cement 877.00 885.00 0
1981-02-23 Cement Squeeze 2460.00 2625.00 0
2017-02-22 Cement Squeeze 894.00 895.00 0
2017-02-22 Perforation 430.00 431.00 17
2017-02-22 Perforation 379.00 380.00 17
2017-02-23 Packing Device Capped w/Cement 416.00 424.00 0
2017-02-23 Cement Squeeze 430.00 431.00 0
2017-02-23 Packing Device Capped w/Cement 365.00 373.00 0
2017-02-23 Perforation 324.00 325.00 17
2017-02-23 Cement Squeeze 379.00 380.00 0
2017-02-24 Perforation 287.00 288.00 17
2017-02-24 Cement Squeeze 324.00 325.00 0
1981-02-27 Perforation 2528.00 2530.00 7
2017-02-24 Packing Device Capped w/Cement 312.00 320.00 0
2017-02-25 Cement Squeeze 287.00 288.00 0
2017-02-25 Packing Device Capped w/Cement 270.00 278.00 0
1981-02-27 Perforation 2534.50 2536.00 7
1981-02-27 Perforation 2543.00 2546.00 7
1981-03-02 Acid Treatment 2528.00 2546.00 0
1981-03-03 Acid Treatment 2528.00 2546.00 0
1981-03-05 Cement Squeeze 2528.00 2546.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 4329 0.0 0.0 0.0
2001 8621 0.0 0.0 0.0
2002 8731 0.0 0.0 0.0
2003 8151 0.0 0.0 0.0
2004 4825 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-08-26 Lost Circulation 2460.00 2460.00
2017-02-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References