X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545152805003

Well Details

Well ID: 0545152805003
Loading map...
Location: 00/05-28-054-15W5/3
Location Alias: 00/05-28-54-15 W5M
Location Alias 2: 00/05-28-054-15 W5/03
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 15
Section: 28
County/Municipality: Yellowhead County
Well Name: HARVEST ROSEVEAR 5-28-54-15
Operator Name: Harvest Operations Corp.
License Number: 0161213
License Date: 1993-09-28
License Status: Amended
Spud Date: 1993-10-11
Final Drill Date: 1993-12-01
Well Total Depth: 3290.00 m
Surface Hole Latitude: 53.690175
Surface Hole Longitude: -116.162662

For data sources see[1][2]

Well History

Date Event
1993-09-28 Obtained License
1993-10-11 Water Flow Occurred
1993-10-13 Water Flow Occurred
1993-10-14 Surface Casing Operation Performed
1993-11-09 Well Log Performed
1993-11-10 Well Log Performed
1993-11-14 Well Log Performed
1993-11-16 Drill Stem Test Performed
1993-11-17 Drill Stem Test Performed
1993-11-18 Drill Stem Test Performed
1993-11-20 Drill Stem Test Performed
1993-11-21 Drill Stem Test Performed
1993-11-24 Production Casing Operation Performed
1993-12-01 Finished Drilling
1993-12-01 Well Log Performed
1993-12-01 Well Mode changed to Drilled and Cased
1993-12-04 Well Log Performed
1993-12-05 Plug Back Performed
1993-12-07 Rig Released
1994-03-24 Well Log Performed
1994-03-28 Perforation Treatment Performed - Jet Perforation
1994-03-28 Well Log Performed
1994-03-30 Liner Casing Operation Performed
1994-03-30 Perforation Treatment Performed - Cement Squeeze
1994-04-07 Perforation Treatment Performed - Jet Perforation
1994-04-07 Well Log Performed
1994-04-08 Perforation Treatment Performed - Acid Wash - No Pressure
1994-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-23 Perforation Treatment Performed - Jet Perforation
1994-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-24 Well Log Performed
1994-04-26 Perforation Treatment Performed - Jet Perforation
1994-04-26 Well Log Performed
1994-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-04 Perforation Treatment Performed - Jet Perforation
1994-05-05 Well Log Performed
1994-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-20 Well Log Performed
1994-05-24 Perforation Treatment Performed - Cement Squeeze
1994-05-26 Perforation Treatment Performed - Jet Perforation
1994-05-26 Well Log Performed
1994-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-29 Perforation Treatment Performed - Chemical Squeeze
1994-11-13 Perforation Treatment Performed - Fractured
2004-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-10-29 Well Log Performed
2005-03-06 Perforation Treatment Performed - Jet Perforation
2005-03-06 Well Log Performed
2005-03-19 Perforation Treatment Performed - Jet Perforation
2005-03-19 Well Log Performed
2005-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-16 Plug Back Performed
2005-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-18 Plug Back Performed
2005-04-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-19 Plug Back Performed
2005-04-19 Well Log Performed
2005-04-20 Perforation Treatment Performed - Jet Perforation
2005-04-20 Well Log Performed
2005-06-03 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-28 Perforation 3197.00 3202.00 13
1994-04-19 Acid Treatment 3186.00 3200.40 0
1994-04-23 Perforation 3161.00 3170.00 13
1994-04-24 Packing Device Capped w/Cement 3176.60 3183.60 0
1994-04-26 Perforation 3155.00 3157.00 13
1994-04-26 Perforation 3144.00 3150.00 13
1994-04-27 Acid Treatment 3144.00 3170.00 0
1994-05-04 Packing Device Capped w/Cement 3133.00 3140.00 0
1994-05-04 Perforation 2416.50 2418.00 16
1994-05-04 Perforation 2409.00 2412.00 16
1994-05-04 Perforation 2389.00 2394.00 16
1994-03-28 Perforation 3191.00 3195.00 13
1994-05-07 Acid Treatment 2409.00 2418.00 0
1994-05-10 Acid Treatment 2389.00 2394.00 0
1994-05-24 Cement Squeeze 2389.00 2418.00 0
1994-05-26 Perforation 2389.00 2394.00 16
1994-05-27 Acid Treatment 2389.00 2394.00 0
1994-05-29 Chemical Squeeze 2389.00 2394.00 0
1994-11-13 Fracture 2389.00 2394.00 0
2004-04-28 Acid Treatment 2389.00 2394.00 0
2005-03-06 Perforation 2497.00 2499.00 17
2005-03-19 Perforation 2748.00 2754.00 17
1994-03-28 Perforation 3165.00 3170.00 13
2005-04-16 Packing Device Capped w/Cement 3001.00 3009.00 0
2005-04-18 Packing Device Capped w/Cement 2734.00 2742.00 0
2005-04-19 Packing Device Capped w/Cement 2377.00 2385.00 0
2005-04-19 Packing Device Capped w/Cement 2487.00 2495.00 0
2005-04-20 Perforation 1545.50 1548.00 17
2005-04-20 Perforation 1549.00 1550.00 17
2005-04-20 Perforation 1552.20 1554.00 17
2005-06-03 Fracture 1545.50 1548.00 0
2005-06-03 Fracture 1549.00 1550.00 0
2005-06-03 Fracture 1552.20 1554.00 0
1994-03-28 Perforation 3153.00 3157.00 13
1994-03-30 Cement Squeeze 3153.00 3202.00 0
1994-04-07 Perforation 3190.40 3200.40 13
1994-04-07 Perforation 3186.00 3189.00 13
1994-04-08 Acid Wash 3186.00 3200.40 0
1994-04-10 Acid Treatment 3186.00 3200.40 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-10-11 Water Flow 67.00 67.00
1993-10-13 Water Flow 448.00 448.00

For data sources see[5]

References