X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554033105040

Well Details

Well ID: 0554033105040
Loading map...
Location: 04/05-31-055-03W4/0
Location Alias: 04/05-31-55-03 W4M
Location Alias 2: 04/05-31-055-03 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 03
Section: 31
County/Municipality: County of St. Paul No. 19
Well Name: PVR 5C FROG LAKE 5-31-55-3
Operator Name: Canadian Natural Resources Limited
License Number: 0177256
License Date: 1995-04-04
License Status: Abandoned
Spud Date: 1995-05-21
Final Drill Date: 1995-05-23
Well Total Depth: 757.00 m
Surface Hole Latitude: 53.792398
Surface Hole Longitude: -110.442018

For data sources see[1][2]

Well History

Date Event
1995-04-04 Obtained License
1995-05-21 Direction Drilling Operation Performed - Deviate
1995-05-22 Surface Casing Operation Performed
1995-05-23 Finished Drilling
1995-05-23 Well Log Performed
1995-05-23 Well Mode changed to Drilled and Cased
1995-05-24 Production Casing Operation Performed
1995-05-24 Rig Released
1995-06-17 Well Log Performed
1995-06-24 Perforation Treatment Performed - Jet Perforation
1995-06-24 Well Log Performed
1995-06-28 Well Began Production
1995-06-28 Well Fluid changed to Crude Bitumen
1995-06-28 Well Mode changed to Pumping
1995-09-06 Well Log Performed
1999-03-22 Well Fluid changed to Crude Bitumen
1999-03-22 Well Mode changed to Suspended
1999-06-22 Well Fluid changed to Crude Bitumen
1999-06-22 Well Mode changed to Pumping
2002-07-29 Perforation Treatment Performed - Chemical Squeeze
2003-02-14 Perforation Treatment Performed - Chemical Squeeze
2004-03-31 Well Fluid changed to Crude Bitumen
2004-03-31 Well Mode changed to Suspended
2004-11-10 Well Fluid changed to Crude Bitumen
2004-11-10 Well Mode changed to Pumping
2006-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-13 Perforation Treatment Performed - Jet Perforation
2006-06-13 Plug Back Performed
2006-06-13 Well Fluid changed to Crude Bitumen
2006-06-13 Well Log Performed
2006-06-13 Well Mode changed to Abandoned Zone
2018-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-01 Plug Back Performed
2018-07-12 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-05-21 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-24 Perforation 732.50 742.50 13
2002-07-29 Chemical Squeeze 732.50 742.50 0
2003-02-14 Chemical Squeeze 732.50 742.50 0
2006-06-13 Packing Device Capped w/Cement 717.00 728.50 0
2006-06-13 Perforation 544.00 548.00 20
2006-06-13 Perforation 550.00 552.00 20
2018-06-01 Packing Device Capped w/Cement 521.50 534.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3962 0.0 0.0 0.0
1996 6774 0.0 0.0 0.0
1997 7610 0.0 0.0 0.0
1998 1836 0.0 0.0 0.0
2000 7044 0.0 0.0 0.0
2001 8749 0.0 0.0 0.0
2002 7849 0.0 0.0 0.0
2003 6722 0.0 0.0 0.0
2004 968 0.0 0.0 0.0
2005 237 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References