X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554033114030

Well Details

Well ID: 0554033114030
Loading map...
Location: 03/14-31-055-03W4/0
Location Alias: 03/14-31-55-03 W4M
Location Alias 2: 03/14-31-055-03 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 03
Section: 31
County/Municipality: County of St. Paul No. 19
Well Name: PVR 14A FROG LAKE 14-31-55-3
Operator Name: Canadian Natural Resources Limited
License Number: 0176665
License Date: 1995-03-06
License Status: Abandoned
Spud Date: 1995-04-04
Final Drill Date: 1995-04-05
Well Total Depth: 564.00 m
Surface Hole Latitude: 53.799035
Surface Hole Longitude: -110.443060

For data sources see[1][2]

Well History

Date Event
1995-03-06 Obtained License
1995-04-04 Direction Drilling Operation Performed - Deviate
1995-04-04 Surface Casing Operation Performed
1995-04-05 Finished Drilling
1995-04-05 Well Mode changed to Drilled and Cased
1995-04-06 Production Casing Operation Performed
1995-04-06 Rig Released
1995-04-06 Well Log Performed
1995-05-18 Well Log Performed
1995-05-21 Well Log Performed
1995-05-22 Perforation Treatment Performed - Jet Perforation
1995-05-24 Well Began Production
1995-05-24 Well Fluid changed to Crude Bitumen
1995-05-24 Well Mode changed to Pumping
1995-05-26 Well Log Performed
1999-03-22 Well Fluid changed to Crude Bitumen
1999-03-22 Well Mode changed to Suspended
2004-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-11 Plug Back Performed
2004-07-11 Well Fluid changed to Crude Bitumen
2004-07-11 Well Mode changed to Abandoned Zone
2004-07-12 Perforation Treatment Performed - Jet Perforation
2004-07-12 Well Log Performed
2008-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-22 Plug Back Performed
2008-10-23 Perforation Treatment Performed - Jet Perforation
2018-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-06 Plug Back Performed
2018-07-11 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-04-04 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-05-22 Perforation 545.50 550.00 13
2004-07-11 Packing Device Capped w/Cement 490.00 543.00 0
2004-07-12 Perforation 462.00 466.50 26
2008-10-22 Packing Device Capped w/Cement 440.00 460.00 0
2008-10-23 Perforation 411.50 414.00 20
2008-10-23 Perforation 415.50 417.00 20
2018-06-06 Packing Device Capped w/Cement 382.40 391.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4869 0.0 0.0 0.0
1996 6849 0.0 0.0 0.0
1997 7548 0.0 0.0 0.0
1998 5903 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References