X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554053010022

Well Details

Well ID: 0554053010022
Loading map...
Location: 02/10-30-055-05W4/2
Location Alias: 02/10-30-55-05 W4M
Location Alias 2: 02/10-30-055-05 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 30
County/Municipality: County of St. Paul No. 19
Well Name: ELAN ET AL 10C LINDBERGH 10-30-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0187425
License Date: 1996-04-25
License Status: Suspension
Spud Date: 1996-06-08
Final Drill Date: 1996-06-10
Well Total Depth: 672.00 m
Surface Hole Latitude: 53.784955
Surface Hole Longitude: -110.730908

For data sources see[1][2]

Well History

Date Event
1996-04-25 Obtained License
1996-06-08 Surface Casing Operation Performed
1996-06-09 Direction Drilling Operation Performed - Deviate
1996-06-10 Finished Drilling
1996-06-10 Well Log Performed
1996-06-10 Well Mode changed to Drilled and Cased
1996-06-11 Production Casing Operation Performed
1996-06-11 Rig Released
1996-06-23 Perforation Treatment Performed - Jet Perforation
1996-06-23 Well Log Performed
1996-10-15 Well Log Performed
2000-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-14 Plug Back Performed
2000-07-17 Perforation Treatment Performed - Jet Perforation
2000-07-17 Well Log Performed
2000-07-17 Well Mode changed to Drilled and Cased
2000-08-01 Well Began Production
2000-08-01 Well Fluid changed to Crude Bitumen
2000-08-01 Well Mode changed to Pumping
2002-11-30 Well Fluid changed to Crude Bitumen
2002-11-30 Well Mode changed to Suspended
2003-06-01 Well Fluid changed to Crude Bitumen
2003-06-01 Well Mode changed to Pumping
2003-08-20 Perforation Treatment Performed - Cement Plug
2003-08-21 Perforation Treatment Performed - Jet Perforation
2003-08-21 Well Log Performed
2006-02-01 Well Fluid changed to Crude Bitumen
2006-02-01 Well Mode changed to Suspended
2013-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-09 541.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-23 Perforation 641.50 645.00 26
1996-06-23 Perforation 648.00 653.50 26
2000-07-14 Packing Device Capped w/Cement 590.00 635.00 0
2000-07-17 Perforation 566.00 567.00 26
2000-07-17 Perforation 569.50 570.50 26
2003-08-20 Cement Plug 570.20 591.10 0
2003-08-21 Perforation 552.50 556.00 26
2013-10-25 Packing Device Capped w/Cement 556.00 563.00 0
2013-10-26 Packing Device Capped w/Cement 535.00 545.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 208 0.0 0.0 0.0
2001 48 0.0 0.0 0.0
2003 2928 0.0 0.0 0.0
2004 5855 0.0 0.0 0.0
2005 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References