X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554071202020

Well Details

Well ID: 0554071202020
Loading map...
Location: 02/02-12-055-07W4/0
Location Alias: 02/02-12-55-07 W4M
Location Alias 2: 02/02-12-055-07 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 07
Section: 12
County/Municipality: County of Two Hills No. 21
Well Name: CNRL 2B ST. PAUL 2-12-55-7
Operator Name: Canadian Natural Resources Limited
License Number: 0444916
License Date: 2012-03-14
License Status: Suspension
Spud Date: 2012-03-21
Final Drill Date: 2012-03-23
Well Total Depth: 767.00 m
Surface Hole Latitude: 53.734615
Surface Hole Longitude: -110.904506

For data sources see[1][2]

Well History

Date Event
2012-03-14 Obtained License
2012-03-21 Direction Drilling Operation Performed - Deviate
2012-03-22 Surface Casing Operation Performed
2012-03-23 Finished Drilling
2012-03-23 Well Mode changed to Drilled and Cased
2012-03-24 Production Casing Operation Performed
2012-03-24 Rig Released
2012-03-24 Well Log Performed
2012-04-14 Perforation Treatment Performed - Jet Perforation
2012-04-17 Well Began Production
2012-04-17 Well Fluid changed to Crude Bitumen
2012-04-17 Well Mode changed to Pumping
2013-01-21 Perforation Treatment Performed - Chemical Squeeze
2013-08-01 Well Log Performed
2013-08-02 Perforation Treatment Performed - Jet Perforation
2013-08-02 Well Log Performed
2013-08-03 Perforation Treatment Performed - Remedial Casing
2016-06-28 Perforation Treatment Performed - Jet Perforation
2016-06-28 Well Log Performed
2018-12-31 Well Fluid changed to Crude Bitumen
2018-12-31 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-21 Precision Drilling Corporation 171 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-21 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-14 Perforation 620.50 623.50 26
2013-01-21 Chemical Squeeze 620.50 623.50 0
2013-08-02 Perforation 241.00 243.00 17
2013-08-03 Remedial Casing Cementing 241.00 243.00 0
2016-06-28 Perforation 623.50 626.00 26

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5325 0.0 0.0 0.0
2013 7891 0.0 0.0 0.0
2014 8181 0.0 0.0 0.0
2015 8247 0.0 0.0 0.0
2016 8189 0.0 0.0 0.0
2017 8171 0.0 0.0 0.0
2018 4676 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-24 No Incident Encountered 0.00 0.00
2012-04-17 No Incident Encountered 0.00 0.00
2013-08-08 No Incident Encountered 0.00 0.00
2016-06-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References