X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554151111003

Well Details

Well ID: 0554151111003
Loading map...
Location: 00/11-11-055-15W4/3
Location Alias: 00/11-11-55-15 W4M
Location Alias 2: 00/11-11-055-15 W4/03
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 15
Section: 11
County/Municipality: County of Two Hills No. 21
Well Name: CPG WILDON 11-11-55-15
Operator Name: Crescent Point Energy Corp.
License Number: 0038385
License Date: 1970-07-09
License Status: Abandoned
Spud Date: 1970-08-12
Final Drill Date: 1970-08-19
Well Total Depth: 713.20 m
Surface Hole Latitude: 53.737347
Surface Hole Longitude: -112.121974

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-07-09 Obtained License
1970-08-16 Drill Stem Test Performed
1970-08-17 Production Casing Operation Performed
1970-08-19 Drill Stem Test Performed
1970-08-19 Finished Drilling
1970-08-19 Well Mode changed to Drilled and Cased
1970-08-20 Drill Stem Test Performed
1970-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-08-29 Perforation Treatment Performed - Open-Hole Completion
1972-06-28 Perforation Treatment Performed - Cement Squeeze
1972-07-01 Perforation Treatment Performed - Bullet Perforation
1972-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-07-12 Perforation Treatment Performed - Bullet Perforation
1972-07-15 Perforation Treatment Performed - Cement Squeeze
1972-07-17 Perforation Treatment Performed - Cement Squeeze
1972-07-17 Perforation Treatment Performed - Selective Jet Perforations
1972-07-18 Perforation Treatment Performed - Bullet Perforation
1972-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-07-19 Perforation Treatment Performed - Acid Wash - No Pressure
1985-09-25 Well Log Performed
1985-09-30 Perforation Treatment Performed - Jet Perforation
1985-09-30 Well Log Performed
1985-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-01 Perforation Treatment Performed - Cement Squeeze
1985-10-01 Perforation Treatment Performed - Jet Perforation
1985-10-01 Well Log Performed
1985-10-03 Perforation Treatment Performed - Jet Perforation
1985-10-03 Well Log Performed
1985-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-21 Perforation Treatment Performed - Cement Squeeze
2004-07-21 Plug Back Performed
2004-07-23 Well Log Performed
2004-07-24 Perforation Treatment Performed - Jet Perforation
2004-07-24 Well Log Performed
2004-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-25 Perforation Treatment Performed - Jet Perforation
2004-07-25 Well Log Performed
2004-07-26 Perforation Treatment Performed - Jet Perforation
2004-07-26 Well Log Performed
2008-05-18 Well Began Production
2008-05-18 Well Fluid changed to Gas
2008-05-18 Well Mode changed to Flowing
2014-09-01 Well Fluid changed to Gas
2014-09-01 Well Mode changed to Suspended
2018-01-30 Well Log Performed
2018-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-01-31 Plug Back Performed
2018-01-31 Well Log Performed
2018-02-01 Well Log Performed
2018-02-08 Well Log Performed
2018-02-09 Perforation Treatment Performed - Cement Plug
2018-02-09 Perforation Treatment Performed - Jet Perforation
2018-02-09 Plug Back Performed
2018-02-09 Well Fluid changed to Gas
2018-02-09 Well Log Performed
2018-02-09 Well Mode changed to Abandoned Zone
2018-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-10 Perforation Treatment Performed - Remedial Casing
2018-02-10 Plug Back Performed
2018-02-11 Well Log Performed
2018-02-12 Perforation Treatment Performed - Jet Perforation
2018-02-12 Well Log Performed
2018-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-13 Perforation Treatment Performed - Remedial Casing
2018-02-13 Plug Back Performed
2018-02-14 Perforation Treatment Performed - Jet Perforation
2018-02-14 Well Log Performed
2018-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-15 Perforation Treatment Performed - Remedial Casing
2018-02-15 Plug Back Performed
2018-03-23 Well Abandoned
2018-03-23 Well Fluid changed to Gas
2018-03-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-08-29 Packing Device Capped w/Cement 662.90 670.60 0
1972-07-17 Cement Squeeze 553.50 553.50 0
1972-07-18 Bullet Perforation 544.10 549.60 13
1972-07-19 Acid Wash 544.10 549.60 0
1972-07-19 Acid Treatment 544.10 549.60 0
1985-09-30 Perforation 556.30 557.20 13
1985-10-01 Perforation 553.50 555.30 13
1985-10-01 Acid Treatment 553.50 557.20 0
1985-10-01 Cement Squeeze 544.10 557.20 0
1985-10-03 Perforation 548.00 549.80 13
1985-10-04 Acid Treatment 548.00 549.80 0
1970-08-29 Open Hole/Barefoot Completion 651.10 662.90 0
2004-07-21 Cement Squeeze 548.00 549.80 0
2004-07-24 Perforation 509.00 510.50 17
2004-07-25 Perforation 510.50 512.50 17
2004-07-25 Acid Treatment 509.00 512.50 0
2004-07-26 Perforation 506.00 508.00 17
2018-01-31 Packing Device Capped w/Cement 630.00 638.00 0
2018-01-31 Packing Device Capped w/Cement 533.00 541.00 0
2018-02-09 Cement Plug 494.00 502.00 0
2018-02-09 Perforation 284.50 285.50 17
2018-02-10 Remedial Casing Cementing 284.50 285.50 0
1972-06-28 Cement Squeeze 651.10 662.90 0
2018-02-10 Packing Device Capped w/Cement 272.00 280.00 0
2018-02-12 Perforation 245.00 246.00 17
2018-02-13 Remedial Casing Cementing 245.00 246.00 0
2018-02-13 Packing Device Capped w/Cement 233.00 241.00 0
2018-02-14 Perforation 198.00 199.00 17
2018-02-15 Remedial Casing Cementing 198.00 199.00 0
2018-02-15 Packing Device Capped w/Cement 186.00 194.50 0
1972-07-01 Bullet Perforation 644.70 647.70 13
1972-07-03 Acid Treatment 644.70 647.70 0
1972-07-12 Bullet Perforation 546.50 549.60 13
1972-07-12 Bullet Perforation 550.50 551.10 13
1972-07-15 Cement Squeeze 546.50 551.10 0
1972-07-17 Selective Jet Perforations 553.50 553.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 403 0.0 0.0 0.0
2010 3 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References