X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554180509022

Well Details

Well ID: 0554180509022
Loading map...
Location: 02/09-05-055-18W4/2
Location Alias: 02/09-05-55-18 W4M
Location Alias 2: 02/09-05-055-18 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 18
Section: 05
County/Municipality: Lamont County
Well Name: TASMAN 102 ASTOTIN 9-5-55-18
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0357231
License Date: 2006-05-15
License Status: RecCertified
Spud Date: 2006-06-14
Final Drill Date: 2006-06-21
Well Total Depth: 960.00 m
Surface Hole Latitude: 53.727439
Surface Hole Longitude: -112.634860

For data sources see[1][2]

Well History

Date Event
2006-05-15 Obtained License
2006-06-15 Surface Casing Operation Performed
2006-06-21 Direction Drilling Operation Performed - Deviate
2006-06-21 Finished Drilling
2006-06-21 Well Mode changed to Drilled and Cased
2006-06-24 Well Log Performed
2006-06-25 Production Casing Operation Performed
2006-06-25 Rig Released
2006-07-05 Perforation Treatment Performed - Jet Perforation
2006-07-06 Perforation Treatment Performed - Jet Perforation
2006-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-07 Perforation Treatment Performed - Jet Perforation
2006-07-07 Plug Back Performed
2006-07-08 Perforation Treatment Performed - Jet Perforation
2006-08-04 Perforation Treatment Performed - Fractured
2007-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-04-06 Plug Back Performed
2007-04-06 Well Abandoned
2007-04-06 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-06-21 500.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-05 Perforation 915.00 916.50 17
2006-07-06 Perforation 910.00 912.50 17
2006-07-07 Packing Device Capped w/Cement 892.00 900.00 0
2006-07-07 Perforation 778.50 780.00 17
2006-07-08 Perforation 728.00 734.00 17
2006-08-04 Fracture 728.00 734.00 0
2007-04-06 Packing Device Capped w/Cement 768.00 776.00 0
2007-04-06 Packing Device Capped w/Cement 715.00 723.00 0

For data sources see[5]



References