X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555091307000

Well Details

Well ID: 0555091307000
Loading map...
Location: 00/07-13-055-09W5/0
Location Alias: 00/07-13-55-09 W5M
Location Alias 2: 00/07-13-055-09 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 09
Section: 13
County/Municipality: Yellowhead County
Well Name: CHINOOK WILDWD 7-13-55-9
Operator Name: Point Loma Resources Ltd.
License Number: 0232473
License Date: 2000-01-22
License Status: Suspension
Spud Date: 2000-02-07
Final Drill Date: 2000-02-14
Well Total Depth: 1768.00 m
Surface Hole Latitude: 53.751096
Surface Hole Longitude: -115.200418

For data sources see[1][2]

Well History

Date Event
2000-01-22 Obtained License
2000-02-08 Surface Casing Operation Performed
2000-02-14 Finished Drilling
2000-02-14 Well Log Performed
2000-02-16 Drill Stem Test Performed
2000-02-16 Production Casing Operation Performed
2000-02-17 Rig Released
2000-02-17 Well Mode changed to Drilled and Cased
2000-02-25 Perforation Treatment Performed - Jet Perforation
2000-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-28 Plug Back Performed
2000-02-29 Perforation Treatment Performed - Jet Perforation
2000-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-02 Plug Back Performed
2000-03-03 Perforation Treatment Performed - Jet Perforation
2000-03-09 Perforation Treatment Performed - Fractured
2001-09-26 Well Began Production
2001-09-26 Well Fluid changed to Gas
2001-09-26 Well Mode changed to Flowing
2013-07-01 Well Fluid changed to Gas
2013-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-25 Perforation 1734.00 1735.00 17
2000-02-28 Packing Device Capped w/Cement 1723.00 1731.00 0
2000-02-29 Perforation 1720.50 1723.50 17
2000-03-01 Acid Treatment 1720.50 1723.50 0
2000-03-02 Packing Device Capped w/Cement 1709.00 1717.00 0
2000-03-03 Perforation 1500.00 1503.00 17
2000-03-09 Fracture 1500.00 1503.00 0
2000-02-25 Perforation 1736.00 1737.50 17
2000-02-25 Perforation 1742.50 1747.00 17
2000-02-26 Acid Treatment 1734.00 1735.00 0
2000-02-26 Acid Treatment 1736.00 1737.50 0
2000-02-26 Acid Treatment 1742.50 1747.00 0
2000-02-27 Acid Treatment 1734.00 1735.00 0
2000-02-27 Acid Treatment 1736.00 1737.50 0
2000-02-27 Acid Treatment 1742.50 1747.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2312 0.0 0.0 0.0
2002 7760 0.0 0.0 0.0
2003 5125 0.0 0.0 0.0
2004 4897 0.0 0.0 0.0
2005 5441 0.0 0.0 0.0
2006 7868 0.0 0.0 0.0
2007 6528 0.0 0.0 0.0
2008 7311 0.0 0.0 0.0
2009 6926 0.0 0.0 0.0
2010 6563 0.0 0.0 0.0
2011 6422 0.0 0.0 0.0
2012 797 0.0 0.0 0.0
2013 156 0.0 0.0 0.0

For data sources see[5]

References