X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564030902000

Well Details

Well ID: 0564030902000
Loading map...
Location: 00/02-09-056-03W4/0
Location Alias: 00/02-09-56-03 W4M
Location Alias 2: 00/02-09-056-03 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 09
County/Municipality: County of St. Paul No. 19
Well Name: PVR 2D FROG LK 2-9-56-3
Operator Name: Canadian Natural Resources Limited
License Number: 0296416
License Date: 2003-11-19
License Status: Abandoned
Spud Date: 2003-12-04
Final Drill Date: 2003-12-05
Well Total Depth: 523.00 m
Surface Hole Latitude: 53.819662
Surface Hole Longitude: -110.385431

For data sources see[1][2]

Well History

Date Event
2003-11-19 Obtained License
2003-12-04 Surface Casing Operation Performed
2003-12-05 Finished Drilling
2003-12-05 Well Log Performed
2003-12-05 Well Mode changed to Drilled and Cased
2003-12-06 Production Casing Operation Performed
2003-12-06 Rig Released
2003-12-19 Perforation Treatment Performed - Jet Perforation
2003-12-19 Well Began Production
2003-12-19 Well Fluid changed to Crude Bitumen
2003-12-19 Well Log Performed
2003-12-19 Well Mode changed to Pumping
2004-02-02 Perforation Treatment Performed - Jet Perforation
2004-02-02 Well Log Performed
2004-03-02 Perforation Treatment Performed - Chemical Squeeze
2005-07-20 Perforation Treatment Performed - Jet Perforation
2006-09-30 Well Fluid changed to Crude Bitumen
2006-09-30 Well Mode changed to Suspended
2009-01-01 Well Fluid changed to Crude Bitumen
2009-01-01 Well Mode changed to Pumping
2009-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-31 Well Fluid changed to Crude Bitumen
2009-12-31 Well Mode changed to Suspended
2017-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-12-16 Plug Back Performed
2017-12-16 Well Fluid changed to Crude Bitumen
2017-12-16 Well Mode changed to Abandoned Zone
2018-09-21 Well Abandoned
2018-09-21 Well Fluid changed to Crude Bitumen
2018-09-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-19 Perforation 459.80 462.30 17
2004-02-02 Perforation 456.00 458.00 17
2004-03-02 Chemical Squeeze 456.00 462.30 0
2005-07-20 Perforation 443.00 445.00 26
2005-07-20 Perforation 452.00 454.50 26
2009-01-29 Packing Device Capped w/Cement 464.50 516.50 0
2017-12-16 Packing Device Capped w/Cement 442.40 451.00 0
2017-12-16 Packing Device Capped w/Cement 424.40 433.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1509 0.0 0.0 0.0
2005 1381 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2009 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References