X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564060304022

Well Details

Well ID: 0564060304022
Loading map...
Location: 02/04-03-056-06W4/2
Location Alias: 02/04-03-56-06 W4M
Location Alias 2: 02/04-03-056-06 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 06
Section: 03
County/Municipality: County of St. Paul No. 19
Well Name: PVR 4C LINDBERGH 4-3-56-6
Operator Name: Canadian Natural Resources Limited
License Number: 0113167
License Date: 1985-02-06
License Status: Abandoned
Spud Date: 1985-03-02
Final Drill Date: 1985-03-05
Well Total Depth: 713.00 m
Surface Hole Latitude: 53.806233
Surface Hole Longitude: -110.815878

For data sources see[1][2]

Well History

Date Event
1985-02-06 Obtained License
1985-03-02 Surface Casing Operation Performed
1985-03-03 Direction Drilling Operation Performed - Straighten Hole
1985-03-05 Finished Drilling
1985-03-05 Well Mode changed to Drilled and Cased
1985-03-07 Well Log Performed
1985-03-08 Production Casing Operation Performed
1985-03-08 Rig Released
1985-06-01 Well Log Performed
1985-06-04 Well Log Performed
1985-07-05 Perforation Treatment Performed - Jet Perforation
1986-10-24 Well Log Performed
1987-10-20 Well Log Performed
1987-10-26 Well Log Performed
1988-06-22 Well Log Performed
1993-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-01-10 Perforation Treatment Performed - Jet Perforation
1993-01-10 Well Log Performed
1993-01-14 Well Began Production
1993-01-14 Well Fluid changed to Crude Bitumen
1993-01-14 Well Mode changed to Pumping
1994-11-02 Perforation Treatment Performed - Jet Perforation
1996-10-01 Well Fluid changed to Crude Bitumen
1996-10-01 Well Mode changed to Suspended
2006-08-12 Well Fluid changed to Crude Bitumen
2006-08-12 Well Mode changed to Pumping
2008-06-30 Well Fluid changed to Crude Bitumen
2008-06-30 Well Mode changed to Suspended
2018-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-05 Plug Back Performed
2018-03-05 Well Fluid changed to Crude Bitumen
2018-03-05 Well Mode changed to Abandoned Zone
2018-03-19 Well Abandoned
2018-03-19 Well Fluid changed to Crude Bitumen
2018-03-19 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-03-03 135.00 Straighten Hole

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-05 Perforation 660.00 664.50 39
1985-07-05 Perforation 668.50 671.50 39
1985-07-05 Perforation 673.00 674.50 39
1985-07-05 Perforation 676.00 678.50 39
1993-01-10 Packing Device Capped w/Cement 626.00 645.00 0
1993-01-10 Perforation 522.00 526.00 26
1994-11-02 Perforation 515.50 518.50 13
2018-03-05 Packing Device Capped w/Cement 495.50 505.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6290 0.0 0.0 0.0
1994 6048 0.0 0.0 0.0
1995 5250 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
2006 345 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References