X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564060305002

Well Details

Well ID: 0564060305002
Loading map...
Location: 00/05-03-056-06W4/2
Location Alias: 00/05-03-56-06 W4M
Location Alias 2: 00/05-03-056-06 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 06
Section: 03
County/Municipality: County of St. Paul No. 19
Well Name: PVR 5A LINDBERGH 5-3-56-6
Operator Name: Canadian Natural Resources Limited
License Number: 0103061
License Date: 1983-09-14
License Status: Suspension
Spud Date: 1983-10-11
Final Drill Date: 1983-10-13
Well Total Depth: 750.00 m
Surface Hole Latitude: 53.807769
Surface Hole Longitude: -110.817069

For data sources see[1][2]

Well History

Date Event
1983-09-14 Obtained License
1983-10-13 Finished Drilling
1983-10-14 Production Casing Operation Performed
1983-11-09 Perforation Treatment Performed - Jet Perforation
1985-12-04 Well Log Performed
1989-10-26 Perforation Treatment Performed - Open-Hole Completion
1989-10-26 Well Log Performed
1989-10-27 Well Log Performed
1989-11-04 Perforation Treatment Performed - Cement Squeeze
1989-11-16 Well Log Performed
1990-02-10 Well Mode changed to Drilled and Cased
1990-02-15 Perforation Treatment Performed - Jet Perforation
1990-02-16 Perforation Treatment Performed - Jet Perforation
1990-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-11 Well Began Injection
1991-10-11 Well Fluid changed to Water
1991-10-11 Well Type changed to Disposal
1991-11-13 Well Log Performed
2004-03-31 Well Fluid changed to Water
2004-03-31 Well Mode changed to Suspended
2004-03-31 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-09 Perforation 601.00 607.50 39
1983-11-09 Perforation 609.00 618.00 39
1989-10-26 Open Hole/Barefoot Completion 639.40 750.00 0
1989-11-04 Cement Squeeze 639.40 750.00 0
1989-11-04 Cement Squeeze 601.00 618.00 0
1990-02-15 Perforation 674.30 680.50 13
1990-02-15 Perforation 687.00 708.00 13
1990-02-16 Perforation 666.50 674.30 13
1990-02-17 Acid Treatment 666.50 708.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References