X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564060307000

Well Details

Well ID: 0564060307000
Loading map...
Location: 00/07-03-056-06W4/0
Location Alias: 00/07-03-56-06 W4M
Location Alias 2: 00/07-03-056-06 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 06
Section: 03
County/Municipality: County of St. Paul No. 19
Well Name: CVE 7A LIND 7-3-56-6
Operator Name: Cenovus Energy Inc.
License Number: 0103120
License Date: 1983-09-16
License Status: Abandoned
Spud Date: 1983-11-05
Final Drill Date: 1983-11-07
Well Total Depth: 645.30 m
Surface Hole Latitude: 53.807825
Surface Hole Longitude: -110.803571

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-16 Obtained License
1983-11-07 Finished Drilling
1983-11-07 Well Mode changed to Drilled and Cased
1983-11-08 Production Casing Operation Performed
1983-12-07 Well Log Performed
1983-12-08 Perforation Treatment Performed - Jet Perforation
1983-12-15 Well Began Production
1983-12-15 Well Fluid changed to Crude Bitumen
1983-12-15 Well Mode changed to Pumping
1985-09-19 Well Log Performed
1985-12-02 Well Log Performed
1986-12-02 Perforation Treatment Performed - Chemical Squeeze
1987-06-12 Well Log Performed
1987-07-24 Well Log Performed
1987-09-17 Well Log Performed
1994-02-01 Well Fluid changed to Crude Bitumen
1994-02-01 Well Mode changed to Suspended
1994-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-14 Plug Back Performed
1994-06-14 Well Fluid changed to Crude Bitumen
1994-06-14 Well Mode changed to Abandoned Zone
1994-06-15 Perforation Treatment Performed - Jet Perforation
1994-06-15 Well Log Performed
1998-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-26 Plug Back Performed
2016-10-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-08 Perforation 607.50 616.50 39
1983-12-08 Perforation 617.00 620.50 39
1986-12-02 Chemical Squeeze 607.50 620.50 0
1994-06-14 Packing Device Capped w/Cement 577.20 592.50 0
1994-06-15 Perforation 486.00 488.00 13
1994-06-15 Perforation 490.00 492.00 13
1998-09-26 Packing Device Capped w/Cement 460.00 481.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 418 0.0 0.0 0.0
1984 7806 0.0 0.0 0.0
1985 7135 0.0 0.0 0.0
1986 6225 0.0 0.0 0.0
1987 6922 0.0 0.0 0.0
1988 1944 0.0 0.0 0.0
1989 6877 0.0 0.0 0.0
1990 8149 0.0 0.0 0.0
1991 4934 0.0 0.0 0.0
1992 2893 0.0 0.0 0.0
1993 1438 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References