X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564060510000

Well Details

Well ID: 0564060510000
Loading map...
Location: 00/10-05-056-06W4/0
Location Alias: 00/10-05-56-06 W4M
Location Alias 2: 00/10-05-056-06 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 06
Section: 05
County/Municipality: County of St. Paul No. 19
Well Name: AMOCO LINDBERGH 10A-5-56-6
Operator Name: Canadian Natural Resources Limited
License Number: 0100917
License Date: 1983-03-08
License Status: Issued
Spud Date: 1983-04-15
Final Drill Date: 1983-04-17
Well Total Depth: 624.00 m
Surface Hole Latitude: 53.810135
Surface Hole Longitude: -110.853642

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-03-08 Obtained License
1983-04-17 Finished Drilling
1983-04-17 Well Mode changed to Drilled and Cased
1983-04-18 Production Casing Operation Performed
1983-05-09 Perforation Treatment Performed - Jet Perforation
1983-05-10 Well Began Production
1983-05-10 Well Fluid changed to Crude Bitumen
1983-05-10 Well Mode changed to Pumping
1984-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-08 Perforation Treatment Performed - Jet Perforation
1984-03-08 Well Fluid changed to Crude Bitumen
1984-03-08 Well Mode changed to Abandoned Zone
1985-06-19 Well Log Performed
2007-03-19 Perforation Treatment Performed - Jet Perforation
2007-03-19 Well Log Performed
2019-05-01 Well Fluid changed to Crude Bitumen
2019-05-01 Well Mode changed to Pumping
2019-05-13 Perforation Treatment Performed - Jet Perforation
2019-05-15 Perforation Treatment Performed - Casing Patch (Over Perfs)
2019-05-15 Well Log Performed
2019-05-16 Perforation Treatment Performed - Jet Perforation
2019-05-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-05-09 Perforation 577.00 579.00 13
2019-05-15 Casing Patch 452.00 459.50 0
2019-05-16 Perforation 577.00 579.00 13
2019-05-16 Perforation 582.00 584.00 13
2019-05-16 Perforation 581.00 582.00 26
1983-05-09 Perforation 582.00 584.00 13
1984-03-08 Packing Device Capped w/Cement 564.00 572.00 0
1984-03-08 Perforation 452.00 454.00 13
1984-03-08 Perforation 457.50 459.50 13
2007-03-19 Perforation 457.50 459.50 26
2007-03-19 Perforation 452.00 454.00 26
2019-05-13 Perforation 582.00 584.00 13
2019-05-13 Perforation 577.00 579.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3243 0.0 0.0 0.0
1984 1311 0.0 0.0 0.0
2019 4912 0.0 0.0 0.0
2020 1689 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References