If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564061403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.832247,"lon":-110.791507,"icon":""}]} |
Location: 00/03-14-056-06W4/0 | |
Location Alias: 00/03-14-56-06 W4M | |
Location Alias 2: 00/03-14-056-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 06 | |
Section: 14 | |
County/Municipality: County of St. Paul No. 19 | |
Well Name: AMOCO ET AL LINDBERGH 3A-14-56-6 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0145493 | |
License Date: 1990-09-21 | |
License Status: Suspension | |
Spud Date: 1990-09-22 | |
Final Drill Date: 1990-09-25 | |
Well Total Depth: 713.00 m | |
Surface Hole Latitude: 53.832247 | |
Surface Hole Longitude: -110.791507 |
Date | Event |
---|---|
1990-09-21 | Obtained License |
1990-09-22 | Direction Drilling Operation Performed - Deviate |
1990-09-23 | Surface Casing Operation Performed |
1990-09-25 | Finished Drilling |
1990-09-25 | Well Log Performed |
1990-09-25 | Well Mode changed to Drilled and Cased |
1990-09-26 | Production Casing Operation Performed |
1990-09-26 | Rig Released |
1990-09-28 | Well Log Performed |
1990-09-29 | Well Log Performed |
1990-10-01 | Well Log Performed |
1990-10-14 | Well Log Performed |
1990-10-31 | Well Log Performed |
1990-12-09 | Perforation Treatment Performed - Jet Perforation |
1990-12-09 | Well Began Production |
1990-12-09 | Well Fluid changed to Crude Bitumen |
1990-12-09 | Well Log Performed |
1990-12-09 | Well Mode changed to Pumping |
1997-06-06 | Well Log Performed |
1998-09-30 | Well Fluid changed to Crude Bitumen |
1998-09-30 | Well Mode changed to Suspended |
2007-02-28 | Well Fluid changed to Crude Bitumen |
2007-02-28 | Well Mode changed to Pumping |
2008-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-03-07 | Plug Back Performed |
2008-03-07 | Well Fluid changed to Crude Bitumen |
2008-03-07 | Well Mode changed to Abandoned Zone |
2008-03-11 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1990-09-22 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-12-09 | Perforation | 696.50 | 698.50 | 26 |
1990-12-09 | Perforation | 698.90 | 700.00 | 26 |
1990-12-09 | Perforation | 703.00 | 705.00 | 26 |
2008-03-07 | Packing Device Capped w/Cement | 680.00 | 688.00 | 0 |
2008-03-11 | Perforation | 583.00 | 584.50 | 26 |
2008-03-11 | Perforation | 585.50 | 587.00 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 504 | 0.0 | 0.0 | 0.0 |
1991 | 8076 | 0.0 | 0.0 | 0.0 |
1992 | 8455 | 0.0 | 0.0 | 0.0 |
1993 | 8759 | 0.0 | 0.0 | 0.0 |
1994 | 8063 | 0.0 | 0.0 | 0.0 |
1995 | 2941 | 0.0 | 0.0 | 0.0 |
1996 | 25 | 0.0 | 0.0 | 0.0 |
2007 | 4287 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]