X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564071207020

Well Details

Well ID: 0564071207020
Loading map...
Location: 02/07-12-056-07W4/0
Location Alias: 02/07-12-56-07 W4M
Location Alias 2: 02/07-12-056-07 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 07
Section: 12
County/Municipality: County of St. Paul No. 19
Well Name: ELAN ET AL 7C LINDBERGH 7-12-56-7
Operator Name: Canadian Natural Resources Limited
License Number: 0181021
License Date: 1995-09-27
License Status: Suspension
Spud Date: 1995-10-03
Final Drill Date: 1995-10-08
Well Total Depth: 724.00 m
Surface Hole Latitude: 53.824621
Surface Hole Longitude: -110.909589

For data sources see[1][2]

Well History

Date Event
1995-09-27 Obtained License
1995-10-03 Surface Casing Operation Performed
1995-10-04 Direction Drilling Operation Performed - Deviate
1995-10-08 Finished Drilling
1995-10-08 Production Casing Operation Performed
1995-10-08 Well Log Performed
1995-10-08 Well Mode changed to Drilled and Cased
1995-10-09 Rig Released
1995-10-09 Well Began Production
1995-10-09 Well Fluid changed to Crude Bitumen
1995-10-09 Well Mode changed to Pumping
1995-10-14 Perforation Treatment Performed - Jet Perforation
1995-10-14 Well Log Performed
1995-10-19 Well Log Performed
2003-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-04 Perforation Treatment Performed - Jet Perforation
2003-03-04 Plug Back Performed
2003-03-04 Well Fluid changed to Crude Bitumen
2003-03-04 Well Mode changed to Abandoned Zone
2011-03-12 Perforation Treatment Performed - Jet Perforation
2011-03-14 Well Log Performed
2011-03-15 Perforation Treatment Performed - Casing Patch (Over Perfs)
2011-03-15 Well Log Performed
2011-03-17 Perforation Treatment Performed - Jet Perforation
2011-03-17 Well Log Performed
2011-03-30 Well Fluid changed to Crude Bitumen
2011-03-30 Well Mode changed to Pumping
2011-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-10 Perforation Treatment Performed - Jet Perforation
2011-07-10 Plug Back Performed
2011-07-10 Well Fluid changed to Crude Bitumen
2011-07-10 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-10-04 105.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-14 Perforation 686.00 691.00 26
2011-07-10 Packing Device Capped w/Cement 650.00 679.00 0
2011-07-10 Perforation 592.00 595.60 26
2011-07-10 Perforation 596.10 598.00 26
1995-10-14 Perforation 695.00 697.00 26
2003-03-04 Packing Device Capped w/Cement 676.00 684.00 0
2003-03-04 Perforation 577.00 581.50 26
2011-03-12 Perforation 695.00 697.00 26
2011-03-12 Perforation 686.00 691.00 26
2011-03-15 Casing Patch 577.00 581.50 0
2011-03-17 Perforation 681.00 682.50 26
2011-03-17 Perforation 685.00 686.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 405 0.0 0.0 0.0
1996 6148 0.0 0.0 0.0
1997 7822 0.0 0.0 0.0
1998 8341 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8517 0.0 0.0 0.0
2001 8751 0.0 0.0 0.0
2002 4693 0.0 0.0 0.0
2011 2121 0.0 0.0 0.0

For data sources see[6]

References