X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584090110000

Well Details

Well ID: 0584090110000
Loading map...
Location: 00/10-01-058-09W4/0
Location Alias: 00/10-01-58-09 W4M
Location Alias 2: 00/10-01-058-09 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 09
Section: 01
County/Municipality: County of St. Paul No. 19
Well Name: CNRL ST.PAUL 10-1-58-9
Operator Name: Canadian Natural Resources Limited
License Number: 0106167
License Date: 1984-02-24
License Status: Suspension
Spud Date: 1984-03-06
Final Drill Date: 1984-03-07
Well Total Depth: 690.00 m
Surface Hole Latitude: 53.986351
Surface Hole Longitude: -111.203711

For data sources see[1][2]

Well History

Date Event
1984-02-24 Obtained License
1984-03-07 Finished Drilling
1984-03-08 Well Log Performed
1984-03-09 Production Casing Operation Performed
1984-03-09 Well Mode changed to Drilled and Cased
1984-05-17 Well Log Performed
1984-05-23 Perforation Treatment Performed - Jet Perforation
1984-08-15 Perforation Treatment Performed - Jet Perforation
1985-02-03 Well Began Production
1985-02-03 Well Fluid changed to Gas
1985-02-03 Well Mode changed to Flowing
1991-07-16 Well Fluid changed to Gas
1991-07-16 Well Mode changed to Suspended
1993-06-06 Perforation Treatment Performed - Jet Perforation
1993-06-06 Well Log Performed
1993-06-07 Perforation Treatment Performed - Jet Perforation
1993-06-07 Well Log Performed
1993-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-08 Perforation Treatment Performed - Jet Perforation
1993-06-08 Plug Back Performed
1993-06-08 Well Fluid changed to Gas
1993-06-08 Well Log Performed
1993-06-08 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-05-23 Perforation 481.00 482.00 13
1984-08-15 Perforation 482.00 483.00 13
1993-06-06 Perforation 481.00 487.00 13
1993-06-07 Perforation 530.50 532.00 13
1993-06-08 Packing Device Capped w/Cement 517.00 525.00 0
1993-06-08 Packing Device Capped w/Cement 469.00 477.00 0
1993-06-08 Perforation 442.00 444.50 13
1993-06-08 Perforation 447.00 448.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 7496 0.0 0.0 0.0
1986 7349 0.0 0.0 0.0
1987 8497 0.0 0.0 0.0
1988 6121 0.0 0.0 0.0
1989 3838 0.0 0.0 0.0
1990 1046 0.0 0.0 0.0

For data sources see[5]

References