X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584110902000

Well Details

Well ID: 0584110902000
Loading map...
Location: 00/02-09-058-11W4/0
Location Alias: 00/02-09-58-11 W4M
Location Alias 2: 00/02-09-058-11 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 11
Section: 09
County/Municipality: County of St. Paul No. 19
Well Name: CNRL SADDLE LAKE 2-9-58-11
Operator Name: Canadian Natural Resources Limited
License Number: 0004172
License Date: 1952-02-04
License Status: Issued
Spud Date: 1952-02-18
Final Drill Date: 1952-03-28
Well Total Depth: 1146.00 m
Surface Hole Latitude: 53.993255
Surface Hole Longitude: -111.573537

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-04 Obtained License
1952-02-23 Drill Stem Test Performed
1952-02-25 Drill Stem Test Performed
1952-02-27 Drill Stem Test Performed
1952-02-28 Drill Stem Test Performed
1952-02-29 Drill Stem Test Performed
1952-03-01 Drill Stem Test Performed
1952-03-02 Drill Stem Test Performed
1952-03-03 Drill Stem Test Performed
1952-03-05 Drill Stem Test Performed
1952-03-07 Production Casing Operation Performed
1952-03-11 Drill Stem Test Performed
1952-03-18 Drill Stem Test Performed
1952-03-19 Drill Stem Test Performed
1952-03-28 Finished Drilling
1952-03-28 Well Mode changed to Drilled and Cased
1952-04-24 Perforation Treatment Performed - Jet Perforation
1952-04-25 Perforation Treatment Performed - Jet Perforation
1952-05-03 Perforation Treatment Performed - Acid Wash - No Pressure
1952-05-04 Perforation Treatment Performed - Jet Perforation
1952-07-28 Well Began Production
1952-07-28 Well Fluid changed to Gas
1952-07-28 Well Mode changed to Pumping
1953-06-24 Well Fluid changed to Gas
1953-06-24 Well Mode changed to Suspended
1974-12-08 Perforation Treatment Performed - Jet Perforation
1974-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-22 Perforation Treatment Performed - Cement Squeeze
1978-03-28 Perforation Treatment Performed - Jet Perforation
1978-03-29 Well Fluid changed to Gas
1978-03-29 Well Mode changed to Flowing
1998-06-28 Well Log Performed
1998-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-29 Plug Back Performed
1998-06-29 Well Fluid changed to Gas
1998-06-29 Well Mode changed to Abandoned Zone
1998-06-30 Perforation Treatment Performed - Jet Perforation
1998-06-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-24 Perforation 487.70 490.70 26
1998-06-29 Packing Device Capped w/Cement 459.50 468.00 0
1998-06-30 Perforation 434.50 436.50 17
1952-04-25 Perforation 486.80 491.60 7
1952-05-03 Acid Wash 486.80 491.60 0
1952-05-04 Perforation 486.80 491.60 7
1974-12-08 Perforation 476.70 478.50 13
1974-12-08 Perforation 479.80 483.40 13
1974-12-09 Acid Treatment 476.70 483.40 0
1978-03-22 Cement Squeeze 476.70 483.40 0
1978-03-28 Perforation 474.90 476.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1977 144 0.0 0.0 0.0
1978 6051 0.0 0.0 0.0
1979 8052 0.0 0.0 0.0
1980 8444 0.0 0.0 0.0
1981 8724 0.0 0.0 0.0
1982 5842 0.0 0.0 0.0
1983 5510 0.0 0.0 0.0
1984 6344 0.0 0.0 0.0
1985 6774 0.0 0.0 0.0
1986 6576 0.0 0.0 0.0
1987 6305 0.0 0.0 0.0
1988 6483 0.0 0.0 0.0
1989 6521 0.0 0.0 0.0
1990 6279 0.0 0.0 0.0
1991 6836 0.0 0.0 0.0
1992 6538 0.0 0.0 0.0
1993 8518 0.0 0.0 0.0
1994 7365 0.0 0.0 0.0
1995 2248 0.0 0.0 0.0
1996 2489 0.0 0.0 0.0
1998 333 0.0 0.0 0.0

For data sources see[5]

References