X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595013306002

Well Details

Well ID: 0595013306002
Loading map...
Location: 00/06-33-059-01W5/2
Location Alias: 00/06-33-59-01 W5M
Location Alias 2: 00/06-33-059-01 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 01
Section: 33
County/Municipality: Westlock County
Well Name: CNRL ET AL WESTLOCK 6-33-59-1
Operator Name: Canadian Natural Resources Limited
License Number: 0165250
License Date: 1994-02-18
License Status: RecCertified
Spud Date: 1994-02-27
Final Drill Date: 1994-03-03
Well Total Depth: 1070.00 m
Surface Hole Latitude: 54.143774
Surface Hole Longitude: -114.090118

For data sources see[1][2]

Well History

Date Event
1994-02-18 Obtained License
1994-02-28 Surface Casing Operation Performed
1994-03-03 Finished Drilling
1994-03-03 Well Mode changed to Drilled and Cased
1994-03-04 Drill Stem Test Performed
1994-03-04 Well Log Performed
1994-03-05 Drill Stem Test Performed
1994-03-06 Production Casing Operation Performed
1994-03-06 Rig Released
1994-08-23 Well Log Performed
1994-08-24 Well Log Performed
1994-08-25 Perforation Treatment Performed - Jet Perforation
1994-11-22 Well Began Production
1994-11-22 Well Fluid changed to Gas
1994-11-22 Well Mode changed to Flowing
1996-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-09 Perforation Treatment Performed - Jet Perforation
1996-08-09 Plug Back Performed
1996-08-09 Well Fluid changed to Gas
1996-08-09 Well Mode changed to Flowing
1997-02-01 Well Fluid changed to Gas
1997-02-01 Well Mode changed to Suspended
2000-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-08 Well Log Performed
2000-06-09 Perforation Treatment Performed - Jet Perforation
2000-06-09 Well Log Performed
2000-06-20 Well Fluid changed to Gas
2000-06-20 Well Mode changed to Flowing
2006-01-01 Well Fluid changed to Gas
2006-01-01 Well Mode changed to Suspended
2006-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-15 Plug Back Performed
2006-08-15 Well Fluid changed to Gas
2006-08-15 Well Mode changed to Abandoned Zone
2006-08-16 Well Abandoned
2006-08-16 Well Fluid changed to Gas
2006-08-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-08-25 Perforation 997.00 998.00 13
1994-08-25 Perforation 789.00 792.00 13
1996-08-09 Packing Device Capped w/Cement 987.00 995.00 0
1996-08-09 Perforation 816.50 817.50 17
1996-08-09 Perforation 799.50 800.50 17
2000-06-08 Packing Device Capped w/Cement 806.00 814.00 0
2000-06-09 Perforation 789.00 792.00 17
2006-08-15 Packing Device Capped w/Cement 791.00 799.00 0
2006-08-15 Packing Device Capped w/Cement 772.00 780.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 898 0.0 0.0 0.0
1995 2979 0.0 0.0 0.0
1996 299 0.0 0.0 0.0
2000 4266 0.0 0.0 0.0
2001 7334 0.0 0.0 0.0
2002 7273 0.0 0.0 0.0
2003 6018 0.0 0.0 0.0
2004 3866 0.0 0.0 0.0

For data sources see[5]

References