X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605171908000

Well Details

Well ID: 0605171908000
Loading map...
Location: 00/08-19-060-17W5/0
Location Alias: 00/08-19-60-17 W5M
Location Alias 2: 00/08-19-060-17 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 17
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRIOIL KAYBOBS 8-19-60-17
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0447472
License Date: 2012-07-31
License Status: Issued
Spud Date: 2012-08-08
Final Drill Date: 2012-08-17
Well Total Depth: 3140.00 m
Surface Hole Latitude: 54.202218
Surface Hole Longitude: -116.553907

For data sources see[1][2]

Well History

Date Event
2012-07-31 Obtained License
2012-08-10 Surface Casing Operation Performed
2012-08-10 Well Log Performed
2012-08-12 Direction Drilling Operation Performed - Deviate
2012-08-13 Direction Drilling Operation Performed - Horizontal
2012-08-14 Well Log Performed
2012-08-17 Finished Drilling
2012-08-17 Well Log Performed
2012-08-17 Well Mode changed to Drilled and Cased
2012-08-19 Liner Casing Operation Performed
2012-08-19 Production Casing Operation Performed
2012-08-20 Rig Released
2012-08-23 Well Log Performed
2012-09-01 Well Began Production
2012-09-01 Well Fluid changed to Crude Oil
2012-09-01 Well Mode changed to Flowing
2012-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-06 Perforation Treatment Performed - Open-Hole Completion
2012-09-07 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-08 Trinidad Drilling Ltd. 94 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-12 1306.30 Deviate (5 - 79 degrees)
2012-08-13 1686.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-06 Open Hole/Barefoot Completion 3131.30 3140.00 0
2012-09-06 Multi-Stage Fracture 2577.80 2577.90 0
2012-09-06 Multi-Stage Fracture 2512.70 2512.80 0
2012-09-06 Multi-Stage Fracture 2447.60 2447.70 0
2012-09-06 Multi-Stage Fracture 2379.20 2379.30 0
2012-09-07 Multi-Stage Fracture 2314.50 2314.60 0
2012-09-07 Multi-Stage Fracture 2249.30 2249.40 0
2012-09-07 Multi-Stage Fracture 2183.10 2183.20 0
2012-09-07 Multi-Stage Fracture 2115.90 2116.00 0
2012-09-07 Multi-Stage Fracture 2047.90 2048.00 0
2012-09-07 Multi-Stage Fracture 1982.30 1982.40 0
2012-09-06 Multi-Stage Fracture 3126.80 3126.90 0
2012-09-07 Multi-Stage Fracture 1913.50 1913.60 0
2012-09-07 Multi-Stage Fracture 1844.00 1844.10 0
2012-09-06 Multi-Stage Fracture 3054.20 3054.30 0
2012-09-06 Multi-Stage Fracture 2984.40 2984.50 0
2012-09-06 Multi-Stage Fracture 2917.20 2917.30 0
2012-09-06 Multi-Stage Fracture 2847.80 2847.90 0
2012-09-06 Multi-Stage Fracture 2779.00 2779.10 0
2012-09-06 Multi-Stage Fracture 2709.50 2709.60 0
2012-09-06 Multi-Stage Fracture 2646.10 2646.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1988 0.0 0.0 0.0
2013 8150 0.0 0.0 0.0
2014 7581 0.0 0.0 0.0
2015 7590 0.0 0.0 0.0
2016 7854 0.0 0.0 0.0
2017 8058 0.0 0.0 0.0
2018 7228 0.0 0.0 0.0
2019 7503 0.0 0.0 0.0
2020 1938 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-20 No Incident Encountered 0.00 0.00
2012-09-16 No Incident Encountered 0.00 0.00

For data sources see[8]

References