X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605181801020

Well Details

Well ID: 0605181801020
Loading map...
Location: 02/01-18-060-18W5/0
Location Alias: 02/01-18-60-18 W5M
Location Alias 2: 02/01-18-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC ETAL 02 HZ KAYBOBS 1-18-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0422317
License Date: 2010-07-30
License Status: Issued
Spud Date: 2010-08-12
Final Drill Date: 2010-09-02
Well Total Depth: 3604.00 m
Surface Hole Latitude: 54.196369
Surface Hole Longitude: -116.677348

For data sources see[1][2]

Well History

Date Event
2010-07-30 Obtained License
2010-08-15 Surface Casing Operation Performed
2010-08-19 Direction Drilling Operation Performed - Horizontal
2010-08-27 Production Casing Operation Performed
2010-09-02 Finished Drilling
2010-09-02 Well Log Performed
2010-09-02 Well Mode changed to Drilled and Cased
2010-09-05 Liner Casing Operation Performed
2010-09-05 Perforation Treatment Performed - Open-Hole Completion
2010-09-06 Rig Released
2010-11-01 Well Log Performed
2010-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-04 Well Began Production
2010-11-04 Well Fluid changed to Gas
2010-11-04 Well Mode changed to Flowing
2011-07-26 Well Fluid changed to Gas
2011-07-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-19 1506.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-05 Open Hole/Barefoot Completion 3581.60 3604.00 0
2010-11-03 Multi-Stage Fracture 2671.10 2672.80 0
2010-11-03 Multi-Stage Fracture 2541.10 2542.80 0
2010-11-03 Multi-Stage Fracture 2461.80 2463.50 0
2010-11-03 Multi-Stage Fracture 3576.70 3577.60 0
2010-11-03 Multi-Stage Fracture 3514.10 3515.80 0
2010-11-03 Multi-Stage Fracture 3400.60 3402.30 0
2010-11-03 Multi-Stage Fracture 3282.20 3283.90 0
2010-11-03 Multi-Stage Fracture 3165.50 3167.20 0
2010-11-03 Multi-Stage Fracture 3034.90 3036.60 0
2010-11-03 Multi-Stage Fracture 2904.80 2906.50 0
2010-11-03 Multi-Stage Fracture 2787.60 2789.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1263 0.0 0.0 0.0
2011 8640 0.0 0.0 0.0
2012 6489 0.0 0.0 0.0
2013 7678 0.0 0.0 0.0
2014 6897 0.0 0.0 0.0
2015 8126 0.0 0.0 0.0
2016 6938 0.0 0.0 0.0
2017 6101 0.0 0.0 0.0
2018 4713 0.0 0.0 0.0
2019 4542 0.0 0.0 0.0
2020 624 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References