X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605182813000

Well Details

Well ID: 0605182813000
Loading map...
Location: 00/13-28-060-18W5/0
Location Alias: 00/13-28-60-18 W5M
Location Alias 2: 00/13-28-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 13-28-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0402753
License Date: 2008-10-24
License Status: Amended
Spud Date: 2008-11-02
Final Drill Date: 2008-11-20
Well Total Depth: 3388.00 m
Surface Hole Latitude: 54.212128
Surface Hole Longitude: -116.650518

For data sources see[1][2]

Well History

Date Event
2008-10-24 Obtained License
2008-11-03 Surface Casing Operation Performed
2008-11-06 Direction Drilling Operation Performed - Horizontal
2008-11-11 Production Casing Operation Performed
2008-11-20 Finished Drilling
2008-11-20 Well Log Performed
2008-11-20 Well Mode changed to Drilled and Cased
2008-11-22 Liner Casing Operation Performed
2008-11-22 Perforation Treatment Performed - Open-Hole Completion
2008-11-23 Rig Released
2008-11-24 Well Log Performed
2008-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2008-12-02 Well Began Production
2008-12-02 Well Fluid changed to Gas
2008-12-02 Well Mode changed to Flowing
2010-10-03 Well Fluid changed to Gas
2010-10-03 Well Log Performed
2010-10-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-11-06 2079.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-11-22 Open Hole/Barefoot Completion 3333.00 3388.00 0
2008-12-02 Multi-Stage Fracture 3323.60 3324.80 0
2008-12-02 Multi-Stage Fracture 3211.80 3212.50 0
2008-12-02 Multi-Stage Fracture 3054.40 3055.20 0
2008-12-02 Multi-Stage Fracture 2866.60 2867.30 0
2008-12-02 Multi-Stage Fracture 2656.20 2656.90 0
2008-12-02 Multi-Stage Fracture 2486.80 2487.50 0
2008-12-02 Multi-Stage Fracture 2384.30 2385.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 701 0.0 0.0 0.0
2009 7726 0.0 0.0 0.0
2010 8447 0.0 0.0 0.0
2011 8549 0.0 0.0 0.0
2012 7852 0.0 0.0 0.0
2013 7438 0.0 0.0 0.0
2014 6740 0.0 0.0 0.0
2015 8217 0.0 0.0 0.0
2016 7536 0.0 0.0 0.0
2017 7438 0.0 0.0 0.0
2018 6376 0.0 0.0 0.0
2019 6565 0.0 0.0 0.0
2020 2055 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-12-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References