X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201013000

Well Details

Well ID: 0605201013000
Loading map...
Location: 00/13-10-060-20W5/0
Location Alias: 00/13-10-60-20 W5M
Location Alias 2: 00/13-10-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 13-10-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0418839
License Date: 2010-02-24
License Status: Suspension
Spud Date: 2010-02-27
Final Drill Date: 2010-03-18
Well Total Depth: 3424.00 m
Surface Hole Latitude: 54.171163
Surface Hole Longitude: -116.920112

For data sources see[1][2]

Well History

Date Event
2010-02-24 Obtained License
2010-03-01 Surface Casing Operation Performed
2010-03-07 Direction Drilling Operation Performed - Horizontal
2010-03-11 Production Casing Operation Performed
2010-03-18 Finished Drilling
2010-03-18 Well Log Performed
2010-03-18 Well Mode changed to Drilled and Cased
2010-03-20 Liner Casing Operation Performed
2010-03-20 Perforation Treatment Performed - Open-Hole Completion
2010-03-21 Rig Released
2010-03-24 Well Log Performed
2010-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-28 Well Began Production
2010-03-28 Well Fluid changed to Gas
2010-03-28 Well Mode changed to Flowing
2014-04-01 Well Fluid changed to Gas
2014-04-01 Well Mode changed to Suspended
2017-01-01 Well Fluid changed to Gas
2017-01-01 Well Mode changed to Flowing
2017-02-01 Well Fluid changed to Gas
2017-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-07 2220.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-20 Open Hole/Barefoot Completion 3397.60 3424.00 0
2010-03-26 Multi-Stage Fracture 2620.00 2620.50 0
2010-03-26 Multi-Stage Fracture 2509.80 2510.30 0
2010-03-26 Multi-Stage Fracture 2438.00 2438.50 0
2010-03-26 Multi-Stage Fracture 3392.70 3393.60 0
2010-03-26 Multi-Stage Fracture 3334.00 3334.50 0
2010-03-26 Multi-Stage Fracture 3238.30 3238.80 0
2010-03-26 Multi-Stage Fracture 3139.50 3140.00 0
2010-03-26 Multi-Stage Fracture 3033.50 3034.00 0
2010-03-26 Multi-Stage Fracture 2935.30 2935.80 0
2010-03-26 Multi-Stage Fracture 2827.20 2827.70 0
2010-03-26 Multi-Stage Fracture 2730.40 2730.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6358 0.0 0.0 0.0
2011 2112 0.0 0.0 0.0
2012 160 0.0 0.0 0.0
2013 954 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References