X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605202209000

Well Details

Well ID: 0605202209000
Loading map...
Location: 00/09-22-060-20W5/0
Location Alias: 00/09-22-60-20 W5M
Location Alias 2: 00/09-22-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: XTO G01 KAYBOBS 9-22-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0492072
License Date: 2018-11-15
License Status: Issued
Spud Date: 2018-11-27
Final Drill Date: 2019-04-28
Well Total Depth: 6745.00 m
Surface Hole Latitude: 54.234657
Surface Hole Longitude: -116.893447

For data sources see[1][2]

Well History

Date Event
2018-11-15 Obtained License
2018-11-28 Surface Casing Operation Performed
2018-12-12 Well Log Performed
2019-03-21 Direction Drilling Operation Performed - Deviate
2019-03-30 Intermediate Casing Operation Performed
2019-04-08 Direction Drilling Operation Performed - Horizontal
2019-04-28 Finished Drilling
2019-04-28 Well Log Performed
2019-04-28 Well Mode changed to Drilled and Cased
2019-04-30 Well Log Performed
2019-05-01 Production Casing Operation Performed
2019-05-02 Rig Released
2019-09-25 Perforation Treatment Performed - Jet Perforation
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Testing
2019-10-03 Perforation Treatment Performed - Fractured
2019-10-03 Perforation Treatment Performed - Jet Perforation
2019-10-04 Perforation Treatment Performed - Fractured
2019-10-04 Perforation Treatment Performed - Jet Perforation
2019-10-05 Perforation Treatment Performed - Fractured
2019-10-05 Perforation Treatment Performed - Jet Perforation
2019-10-06 Perforation Treatment Performed - Fractured
2019-10-06 Perforation Treatment Performed - Jet Perforation
2019-10-07 Perforation Treatment Performed - Fractured
2019-10-07 Perforation Treatment Performed - Jet Perforation
2019-10-08 Perforation Treatment Performed - Fractured
2019-10-08 Perforation Treatment Performed - Jet Perforation
2019-10-09 Perforation Treatment Performed - Fractured
2019-10-09 Perforation Treatment Performed - Jet Perforation
2019-10-10 Perforation Treatment Performed - Fractured
2019-10-10 Perforation Treatment Performed - Jet Perforation
2019-10-11 Perforation Treatment Performed - Fractured
2019-10-11 Perforation Treatment Performed - Jet Perforation
2019-10-12 Perforation Treatment Performed - Fractured
2019-10-12 Perforation Treatment Performed - Jet Perforation
2019-10-13 Perforation Treatment Performed - Fractured
2019-10-13 Perforation Treatment Performed - Jet Perforation
2019-10-14 Perforation Treatment Performed - Fractured
2019-10-14 Perforation Treatment Performed - Jet Perforation
2019-10-15 Perforation Treatment Performed - Fractured
2019-10-15 Perforation Treatment Performed - Jet Perforation
2019-10-16 Perforation Treatment Performed - Fractured
2019-10-16 Perforation Treatment Performed - Jet Perforation
2019-10-17 Perforation Treatment Performed - Fractured
2019-10-17 Perforation Treatment Performed - Jet Perforation
2019-10-18 Perforation Treatment Performed - Fractured
2019-10-18 Perforation Treatment Performed - Jet Perforation
2019-10-19 Perforation Treatment Performed - Fractured
2019-10-19 Perforation Treatment Performed - Jet Perforation
2019-10-20 Perforation Treatment Performed - Fractured
2019-10-20 Perforation Treatment Performed - Jet Perforation
2019-10-21 Perforation Treatment Performed - Fractured
2019-11-30 Well Fluid changed to Gas
2019-11-30 Well Mode changed to Test Completed
2019-12-01 Well Began Production
2019-12-01 Well Fluid changed to Gas
2019-12-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-04-05 Trinidad Drilling Ltd. 56 N/A Drill To LD
2019-03-21 Trinidad Drilling Ltd. 56 N/A Resumption
2018-11-27 Trinidad Drilling Ltd. 56 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-21 576.50 Deviate (5 - 79 degrees)
2019-04-08 3519.10 Horizontal

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-03 2019-10-21 3,347 63,186 N/A
2 2019-10-03 2019-10-16 3,347 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric acid 7647-01-0 100 0.416 N/A
Water 7732-18-5 100 48.3603 N/A
100 Mesh Halliburton Crystalline silica. quartz 14808-60-7 100 0.387 N/A
40/70 Premium Halliburton Crystalline silica. quartz 14808-60-7 100 10.7784 N/A
MC B-8510 Mutli-Chem Bactericide/Biocide 2.2 Dibromo-3-nitrilopropionamide 10222-01-2 100 0.009 N/A
2.2-Dibromomalonamide 73003-80-2 100 0.009 N/A
2-Monobromo-3-nitrilopropionamide 1113-55-9 100 0.009 N/A
Dibromoacetonitrile 3252-43-5 100 0.009 N/A
Inert Ingredient(s) Not Available 100 0.009 N/A
FightR EC-1 Halliburton Friction Reducer Inert Ingredient(s) Not Available 100 0.0385 N/A
2 FDP-S1346-18 Halliburton Friction Reducer Inert Ingredient(s) Not Available 100 0.0525 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-29 2019-10-20 Surface Water - River 31246

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[8]

References