X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605203315000

Well Details

Well ID: 0605203315000
Loading map...
Location: 00/15-33-060-20W5/0
Location Alias: 00/15-33-60-20 W5M
Location Alias 2: 00/15-33-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC ET AL HZ KAYBOBS 15-33-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0420847
License Date: 2010-06-02
License Status: Amended
Spud Date: 2010-06-25
Final Drill Date: 2010-07-29
Well Total Depth: 5080.00 m
Surface Hole Latitude: 54.223014
Surface Hole Longitude: -116.928240

For data sources see[1][2]

Well History

Date Event
2010-06-02 Obtained License
2010-06-28 Surface Casing Operation Performed
2010-07-15 Direction Drilling Operation Performed - Horizontal
2010-07-18 Well Log Performed
2010-07-20 Production Casing Operation Performed
2010-07-29 Finished Drilling
2010-07-29 Well Log Performed
2010-07-29 Well Mode changed to Drilled and Cased
2010-07-30 Well Log Performed
2010-08-04 Liner Casing Operation Performed
2010-08-04 Perforation Treatment Performed - Open-Hole Completion
2010-08-05 Rig Released
2010-08-06 Well Log Performed
2010-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-17 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-20 Well Fluid changed to Gas
2010-08-20 Well Mode changed to Testing
2010-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-31 Well Log Performed
2010-09-04 Well Log Performed
2010-11-30 Well Fluid changed to Gas
2010-11-30 Well Mode changed to Test Completed
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Testing
2011-04-20 Well Began Production
2011-04-20 Well Fluid changed to Shale Gas Only
2011-04-20 Well Mode changed to Flowing
2014-09-18 Perforation Treatment Performed - Cement Plug
2014-09-18 Plug Back Performed
2014-09-18 Well Fluid changed to Gas
2014-09-18 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-15 3133.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-04 Open Hole/Barefoot Completion 5067.00 5080.00 0
2010-08-15 Multi-Stage Fracture 5057.10 5058.40 0
2010-08-15 Multi-Stage Fracture 4959.40 4960.20 0
2010-08-17 Multi-Stage Fracture 4825.70 4826.50 0
2010-08-17 Multi-Stage Fracture 4691.80 4692.60 0
2010-08-18 Multi-Stage Fracture 4570.50 4571.30 0
2010-08-18 Multi-Stage Fracture 4423.50 4424.30 0
2010-08-24 Multi-Stage Fracture 4289.60 4290.40 0
2014-09-18 Cement Plug 2719.00 3280.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 111 0.0 0.0 0.0
2011 5830 0.0 0.0 0.0
2012 6458 0.0 0.0 0.0
2013 3686 0.0 0.0 0.0
2014 1 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References