X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605232016022

Well Details

Well ID: 0605232016022
Loading map...
Location: 02/16-20-060-23W5/2
Location Alias: 02/16-20-60-23 W5M
Location Alias 2: 02/16-20-060-23 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 23
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: ATH 102 HZ PLACID 16-20-60-23
Operator Name: Athabasca Oil Corporation
License Number: 0480316
License Date: 2016-09-08
License Status: Amended
Spud Date: 2016-09-24
Final Drill Date: 2016-12-28
Well Total Depth: 5268.00 m
Surface Hole Latitude: 54.223727
Surface Hole Longitude: -117.431464

For data sources see[1][2]

Well History

Date Event
2016-09-08 Obtained License
2016-09-26 Surface Casing Operation Performed
2016-09-27 Direction Drilling Operation Performed - Deviate
2016-10-03 Intermediate Casing Operation Performed
2016-10-14 Direction Drilling Operation Performed - Horizontal
2016-12-28 Finished Drilling
2016-12-28 Well Log Performed
2016-12-28 Well Mode changed to Drilled and Cased
2016-12-29 Production Casing Operation Performed
2016-12-30 Rig Released
2017-01-24 Perforation Treatment Performed - Open-Hole Completion
2017-01-26 Well Log Performed
2017-02-17 Perforation Treatment Performed - Jet Perforation
2017-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-18 Perforation Treatment Performed - Fractured
2017-02-18 Perforation Treatment Performed - Jet Perforation
2017-02-19 Perforation Treatment Performed - Fractured
2017-02-19 Perforation Treatment Performed - Jet Perforation
2017-02-20 Perforation Treatment Performed - Fractured
2017-02-20 Perforation Treatment Performed - Jet Perforation
2017-02-21 Perforation Treatment Performed - Fractured
2017-02-21 Perforation Treatment Performed - Jet Perforation
2017-02-22 Perforation Treatment Performed - Fractured
2017-02-22 Perforation Treatment Performed - Jet Perforation
2017-02-23 Perforation Treatment Performed - Fractured
2017-02-23 Perforation Treatment Performed - Jet Perforation
2017-02-24 Well Fluid changed to Gas
2017-02-24 Well Mode changed to Testing
2017-04-01 Well Began Production
2017-04-01 Well Fluid changed to Gas
2017-04-01 Well Mode changed to Flowing
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-09-27 694.80 Deviate (5 - 79 degrees)
2016-10-14 2619.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-24 Open Hole/Barefoot Completion 5261.00 5268.00 0
2017-02-18 Perforation 5011.00 5011.50 20
2017-02-23 Fracture 3091.00 3151.50 0
2017-02-23 Perforation 3061.00 3061.50 20
2017-02-23 Perforation 3031.00 3031.50 20
2017-02-23 Perforation 3001.00 3001.50 20
2017-02-23 Fracture 3001.00 3061.50 0
2017-02-23 Perforation 2971.00 2971.50 20
2017-02-23 Perforation 2941.00 2941.50 20
2017-02-23 Perforation 2911.00 2911.50 20
2017-02-23 Fracture 2911.00 2971.50 0
2017-02-18 Fracture 5011.00 5041.50 0
2017-02-18 Perforation 4981.00 4981.50 20
2017-02-18 Perforation 4951.00 4951.50 20
2017-02-18 Fracture 4951.00 4981.50 0
2017-02-18 Perforation 4921.00 4921.50 20
2017-02-18 Perforation 4891.00 4891.50 20
2017-02-18 Fracture 4891.00 4921.50 0
2017-02-18 Perforation 4861.00 4861.50 20
2017-02-18 Perforation 4831.00 4831.50 20
2017-02-17 Multi-Stage Fracture 5205.80 5223.60 0
2017-02-18 Fracture 4831.00 4861.50 0
2017-02-19 Perforation 4801.00 4801.50 20
2017-02-19 Perforation 4771.00 4771.50 20
2017-02-19 Fracture 4771.00 4801.50 0
2017-02-19 Perforation 4741.00 4741.50 20
2017-02-19 Perforation 4711.00 4711.50 20
2017-02-19 Fracture 4711.00 4741.50 0
2017-02-19 Perforation 4681.00 4681.50 20
2017-02-19 Perforation 4651.00 4651.50 20
2017-02-19 Fracture 4651.00 4681.50 0
2017-02-17 Perforation 5161.00 5161.50 20
2017-02-19 Perforation 4621.00 4621.50 20
2017-02-19 Perforation 4591.00 4951.50 20
2017-02-19 Fracture 4591.00 4621.50 0
2017-02-19 Perforation 4561.00 4561.50 20
2017-02-19 Perforation 4531.00 4531.50 20
2017-02-19 Fracture 4531.00 4561.50 0
2017-02-19 Perforation 4501.00 4501.50 20
2017-02-19 Perforation 4471.00 4471.50 20
2017-02-19 Fracture 4471.00 4501.50 0
2017-02-20 Perforation 4441.00 4441.50 20
2017-02-17 Perforation 5131.00 5131.50 20
2017-02-20 Perforation 4411.00 4411.50 20
2017-02-20 Fracture 4411.00 4441.50 0
2017-02-20 Perforation 4381.00 4381.50 20
2017-02-20 Perforation 4351.00 4351.50 20
2017-02-20 Fracture 4351.00 4381.50 0
2017-02-20 Perforation 4321.00 4321.50 20
2017-02-20 Perforation 4291.00 4291.50 20
2017-02-20 Perforation 4261.00 4261.50 20
2017-02-20 Fracture 4261.00 4321.50 0
2017-02-20 Perforation 4231.00 4231.50 20
2017-02-18 Fracture 5131.00 5161.50 0
2017-02-20 Perforation 4201.00 4201.50 20
2017-02-20 Perforation 4171.00 4171.50 20
2017-02-20 Fracture 4171.00 4231.50 0
2017-02-20 Perforation 4141.00 4141.50 20
2017-02-20 Perforation 4111.00 4111.50 20
2017-02-20 Perforation 4081.00 4081.50 20
2017-02-20 Fracture 4081.00 4141.50 0
2017-02-21 Perforation 4051.00 4051.50 20
2017-02-21 Perforation 4021.00 4021.50 20
2017-02-21 Perforation 3991.00 3991.50 20
2017-02-18 Perforation 5101.00 5101.50 20
2017-02-21 Fracture 3991.00 4051.50 0
2017-02-21 Perforation 3961.00 3961.50 20
2017-02-21 Perforation 3931.00 3931.50 20
2017-02-21 Perforation 3901.00 3901.50 20
2017-02-21 Fracture 3901.00 3961.50 0
2017-02-21 Perforation 3871.00 3871.50 20
2017-02-21 Perforation 3841.00 3841.50 20
2017-02-21 Perforation 3811.00 3811.50 20
2017-02-21 Fracture 3811.00 3871.50 0
2017-02-21 Perforation 3781.00 3781.50 20
2017-02-18 Perforation 5071.00 5071.50 20
2017-02-21 Perforation 3751.00 3751.50 20
2017-02-21 Perforation 3721.00 3721.50 20
2017-02-21 Fracture 3721.00 3781.50 0
2017-02-21 Perforation 3691.00 3691.50 20
2017-02-21 Perforation 3661.00 3661.50 20
2017-02-21 Perforation 3631.00 3631.50 20
2017-02-22 Fracture 3631.00 3691.50 0
2017-02-22 Perforation 3601.00 3601.50 20
2017-02-22 Perforation 3571.00 3571.50 20
2017-02-22 Perforation 3541.00 3541.50 20
2017-02-18 Fracture 5071.00 5101.50 0
2017-02-22 Fracture 3541.00 3601.50 0
2017-02-22 Perforation 3511.00 3511.50 20
2017-02-22 Perforation 3481.00 3481.50 20
2017-02-22 Perforation 3451.00 3451.50 20
2017-02-22 Fracture 3451.00 3511.50 0
2017-02-22 Perforation 3421.00 3421.50 20
2017-02-22 Perforation 3391.00 3391.50 20
2017-02-22 Perforation 3361.00 3361.50 20
2017-02-22 Fracture 3361.00 3421.50 0
2017-02-22 Perforation 3331.00 3331.50 20
2017-02-18 Perforation 5041.00 5041.50 20
2017-02-22 Perforation 3301.00 3301.50 20
2017-02-22 Perforation 3271.00 3271.50 20
2017-02-22 Fracture 3271.00 3331.50 0
2017-02-22 Perforation 3241.00 3241.50 20
2017-02-22 Perforation 3211.00 3211.50 20
2017-02-22 Perforation 3181.00 3181.50 20
2017-02-22 Fracture 3181.00 3241.50 0
2017-02-23 Perforation 3151.00 3151.50 20
2017-02-23 Perforation 3121.00 3121.50 20
2017-02-23 Perforation 3091.00 3091.50 20

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-17 2017-02-23 2,763 17,523 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 79.3059 N/A
PR-6000 (20/40) Canyon Technical Services No specific ingredients Not Available 100 1.4112 N/A
Sand (20/40) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.534 N/A
Crystalline silica. quartz 14808-60-7 100 3.534 N/A
Iron Oxide 1309-37-1 100 3.534 N/A
Titanium Oxide 13463-67-7 100 3.534 N/A
Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 9.5145 N/A
Crystalline silica. quartz 14808-60-7 100 9.5145 N/A
Iron Oxide 1309-37-1 100 9.5145 N/A
Titanium Oxide 13463-67-7 100 9.5144 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 1.4171 N/A
Crystalline silica. quartz 14808-60-7 100 1.4171 N/A
Iron Oxide 1309-37-1 100 1.4171 N/A
Titanium Oxide 13463-67-7 100 1.4171 N/A
HCL 15% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 1.5232 N/A
Water 7732-18-5 100 1.5232 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.0083 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.0083 N/A
CAN-2321 Breaker (Oxidizer Delayed HT) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.0047 N/A
Crystalline silica. quartz 14808-60-7 100 0.0047 N/A
CAN-2102 pH Buffer (HpH) Canyon Technical Services Buffer Methyl Alcohol 67-56-1 100 0.0361 N/A
Sodium Hydroxide 1310-73-2 100 0.0361 N/A
Water 7732-18-5 100 0.0361 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.09 N/A
CAN-2200S Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Monoethanolamine 141-43-5 100 0.0477 N/A
Water 7732-18-5 100 0.0477 N/A
Nitrogen Gas Canyon Technical Services Energizing Fluid Nitrogen 7727-37-9 100 2.9008 N/A
Non-hazardous base ingredient(s) Not Available 100 2.9008 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.0828 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0729 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0117 N/A
Potassium Chloride 7447-40-7 100 0.0117 N/A
Water 7732-18-5 100 0.0117 N/A
CAN-2403 nanoFLO Canyon Technical Services Surfactant Ethanol 64-17-5 100 0.0382 N/A
Methanol 67-56-1 100 0.0382 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0382 N/A
Water 7732-18-5 100 0.0382 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-25 2017-02-08 Surface Water - River 18403

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6783 0.0 0.0 0.0
2018 8599 0.0 0.0 0.0
2019 8438 0.0 0.0 0.0
2020 1742 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-18 No Incident Encountered 0.00 0.00
2017-02-23 No Incident Encountered 0.00 0.00

For data sources see[9]

References