X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605242610000

Well Details

Well ID: 0605242610000
Loading map...
Location: 00/10-26-060-24W5/0
Location Alias: 00/10-26-60-24 W5M
Location Alias 2: 00/10-26-060-24 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 24
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: ATH HZ PLACID 10-26-60-24
Operator Name: Athabasca Oil Corporation
License Number: 0486457
License Date: 2017-11-22
License Status: Issued
Spud Date: 2017-12-22
Final Drill Date: 2018-02-25
Well Total Depth: 5869.00 m
Surface Hole Latitude: 54.204295
Surface Hole Longitude: -117.448466

For data sources see[1][2]

Well History

Date Event
2017-11-22 Obtained License
2017-12-23 Surface Casing Operation Performed
2018-02-07 Direction Drilling Operation Performed - Deviate
2018-02-12 Well Log Performed
2018-02-18 Intermediate Casing Operation Performed
2018-02-19 Direction Drilling Operation Performed - Horizontal
2018-02-25 Finished Drilling
2018-02-25 Well Log Performed
2018-02-25 Well Mode changed to Drilled and Cased
2018-02-27 Production Casing Operation Performed
2018-02-27 Rig Released
2018-08-03 Perforation Treatment Performed - Open-Hole Completion
2018-08-05 Well Log Performed
2018-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-24 Perforation Treatment Performed - Fractured
2018-08-24 Perforation Treatment Performed - Jet Perforation
2018-08-25 Perforation Treatment Performed - Fractured
2018-08-25 Perforation Treatment Performed - Jet Perforation
2018-08-26 Perforation Treatment Performed - Fractured
2018-08-26 Perforation Treatment Performed - Jet Perforation
2018-08-27 Perforation Treatment Performed - Fractured
2018-08-27 Perforation Treatment Performed - Jet Perforation
2018-08-28 Perforation Treatment Performed - Fractured
2018-08-28 Perforation Treatment Performed - Jet Perforation
2018-08-29 Perforation Treatment Performed - Fractured
2018-08-29 Perforation Treatment Performed - Jet Perforation
2018-08-30 Perforation Treatment Performed - Fractured
2018-08-30 Perforation Treatment Performed - Jet Perforation
2018-08-31 Perforation Treatment Performed - Fractured
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Fractured
2018-09-01 Perforation Treatment Performed - Jet Perforation
2018-09-02 Perforation Treatment Performed - Fractured
2018-09-02 Perforation Treatment Performed - Jet Perforation
2018-09-03 Perforation Treatment Performed - Fractured
2018-09-03 Perforation Treatment Performed - Jet Perforation
2018-10-09 Well Fluid changed to Gas
2018-10-09 Well Mode changed to Testing
2018-10-22 Well Began Production
2018-10-22 Well Fluid changed to Gas
2018-10-22 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-07 Precision Drilling Corporation 531 N/A Resumption
2017-12-22 Precision Drilling Corporation 531 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-07 663.80 Deviate (5 - 79 degrees)
2018-02-19 3024.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-03 Open Hole/Barefoot Completion 5862.00 5869.00 0
2018-08-24 Fracture 5676.00 5716.30 0
2018-08-29 Perforation 4316.00 4316.30 20
2018-08-29 Perforation 4296.00 4296.30 20
2018-08-29 Fracture 4296.00 4336.30 0
2018-08-29 Perforation 4276.00 4276.30 20
2018-08-29 Perforation 4256.00 4256.30 20
2018-08-29 Perforation 4236.00 4236.30 20
2018-08-30 Fracture 4236.00 4276.30 0
2018-08-30 Perforation 4216.00 4216.30 20
2018-08-30 Perforation 4196.00 4196.30 20
2018-08-30 Perforation 4176.00 4176.30 20
2018-08-24 Perforation 5656.00 5656.30 20
2018-08-30 Fracture 4176.00 4216.30 0
2018-08-30 Perforation 4156.00 4156.30 20
2018-08-30 Perforation 4136.00 4136.30 20
2018-08-30 Perforation 4116.00 4116.30 20
2018-08-30 Fracture 4116.00 4156.30 0
2018-08-30 Perforation 4096.00 4096.30 20
2018-08-30 Perforation 4076.00 4076.30 20
2018-08-30 Perforation 4056.00 4056.30 20
2018-08-30 Fracture 4056.00 4096.30 0
2018-08-30 Perforation 4036.00 4036.30 20
2018-08-24 Perforation 5636.00 5636.30 20
2018-08-30 Perforation 4016.00 4016.30 20
2018-08-30 Perforation 3996.00 3996.30 20
2018-08-30 Fracture 3996.00 4036.30 0
2018-08-30 Perforation 3976.00 3976.30 20
2018-08-30 Perforation 3956.00 3956.30 20
2018-08-30 Perforation 3936.00 3936.30 20
2018-08-31 Fracture 3936.00 3976.30 0
2018-08-31 Perforation 3916.00 3916.30 20
2018-08-31 Perforation 3896.00 3896.30 20
2018-08-31 Perforation 3876.00 3876.30 20
2018-08-24 Perforation 5616.00 5616.30 20
2018-08-31 Fracture 3876.00 3916.30 0
2018-09-01 Perforation 3856.00 3856.30 20
2018-09-01 Perforation 3836.00 3836.30 20
2018-09-01 Perforation 3816.00 3816.30 20
2018-09-01 Fracture 3816.00 3856.30 0
2018-09-01 Perforation 3796.00 3796.30 20
2018-09-01 Perforation 3776.00 3776.30 20
2018-09-01 Perforation 3756.00 3756.30 20
2018-09-01 Fracture 3756.00 3796.30 0
2018-09-01 Perforation 3736.00 3736.30 20
2018-08-25 Fracture 5616.00 5656.30 0
2018-09-01 Perforation 3716.00 3716.30 20
2018-09-01 Perforation 3696.00 3696.30 20
2018-09-01 Fracture 3696.00 3736.30 0
2018-09-01 Perforation 3676.00 3676.30 20
2018-09-01 Perforation 3656.00 3656.30 20
2018-09-01 Perforation 3636.00 3636.30 20
2018-09-01 Fracture 3636.00 3676.30 0
2018-09-01 Perforation 3616.00 3616.30 20
2018-09-01 Perforation 3596.00 3596.30 20
2018-09-01 Perforation 3576.00 3576.30 20
2018-08-25 Perforation 5596.00 5596.30 20
2018-09-02 Fracture 3576.00 3616.30 0
2018-09-02 Perforation 3556.00 3556.30 20
2018-09-02 Perforation 3536.00 3536.30 20
2018-09-02 Perforation 3516.00 3516.30 20
2018-09-02 Fracture 3516.00 3556.30 0
2018-09-02 Perforation 3496.00 3496.30 20
2018-09-02 Perforation 3476.00 3476.30 20
2018-09-02 Perforation 3456.00 3456.30 20
2018-09-02 Fracture 3456.00 3496.30 0
2018-09-02 Perforation 3436.00 3436.30 20
2018-08-25 Perforation 5576.00 5576.30 20
2018-09-02 Perforation 3416.00 3416.30 20
2018-09-02 Perforation 3396.00 3396.30 20
2018-09-02 Fracture 3396.00 3436.30 0
2018-09-02 Perforation 3376.00 3376.30 20
2018-09-02 Perforation 3356.00 3356.30 20
2018-09-02 Perforation 3336.00 3336.30 20
2018-09-02 Fracture 3336.00 3376.30 0
2018-09-02 Perforation 3316.00 3316.30 20
2018-09-02 Perforation 3296.00 3296.30 20
2018-09-02 Perforation 3276.00 3276.30 20
2018-08-25 Perforation 5556.00 5556.30 20
2018-09-02 Fracture 3276.00 3316.30 0
2018-09-02 Perforation 3256.00 3256.30 20
2018-09-02 Perforation 3236.00 3236.30 20
2018-09-02 Perforation 3216.00 3216.30 20
2018-09-02 Fracture 3216.00 3256.30 0
2018-09-03 Perforation 3196.00 3196.30 20
2018-09-03 Perforation 3176.00 3176.30 20
2018-09-03 Perforation 3156.00 3156.30 20
2018-09-03 Fracture 3156.00 3196.30 0
2018-09-03 Perforation 3136.00 3136.30 20
2018-08-25 Fracture 5556.00 5596.30 0
2018-09-03 Perforation 3116.00 3116.30 20
2018-09-03 Perforation 3096.00 3096.30 20
2018-09-03 Fracture 3096.00 3136.30 0
2018-08-25 Perforation 5536.00 5536.30 20
2018-08-14 Multi-Stage Fracture 5795.70 5825.80 0
2018-08-25 Perforation 5516.00 5516.30 20
2018-08-25 Perforation 5496.00 5496.30 20
2018-08-25 Fracture 5496.00 5536.30 0
2018-08-25 Perforation 5476.00 5476.30 20
2018-08-25 Perforation 5456.00 5456.30 20
2018-08-25 Perforation 5436.00 5436.30 20
2018-08-25 Fracture 5436.00 5476.30 0
2018-08-25 Perforation 5416.00 5416.30 20
2018-08-25 Perforation 5396.00 5396.30 20
2018-08-25 Perforation 5376.00 5376.30 20
2018-08-24 Perforation 5776.00 5776.30 20
2018-08-25 Fracture 5376.00 5416.30 0
2018-08-26 Perforation 5356.00 5356.30 20
2018-08-26 Perforation 5336.00 5336.30 20
2018-08-26 Perforation 5316.00 5316.30 20
2018-08-26 Fracture 5316.00 5356.30 0
2018-08-26 Perforation 5296.00 5296.30 20
2018-08-26 Perforation 5276.00 5276.30 20
2018-08-26 Perforation 5256.00 5256.30 20
2018-08-26 Fracture 5256.00 5296.30 0
2018-08-26 Perforation 5236.00 5236.30 20
2018-08-24 Perforation 5756.00 5756.30 20
2018-08-26 Perforation 5216.00 5216.30 20
2018-08-26 Perforation 5196.00 5196.30 20
2018-08-26 Fracture 5196.00 5236.30 0
2018-08-26 Perforation 5176.00 5176.30 20
2018-08-26 Perforation 5156.00 5156.30 20
2018-08-26 Perforation 5136.00 5136.30 20
2018-08-26 Fracture 5136.00 5176.30 0
2018-08-26 Perforation 5116.00 5116.30 20
2018-08-26 Perforation 5096.00 5096.30 20
2018-08-26 Perforation 5076.00 5076.30 20
2018-08-24 Perforation 5736.00 5736.30 20
2018-08-27 Fracture 5076.00 5116.30 0
2018-08-27 Perforation 5056.00 5056.30 20
2018-08-27 Perforation 5036.00 5036.30 20
2018-08-27 Perforation 5016.00 5016.30 20
2018-08-27 Fracture 5016.00 5056.30 0
2018-08-27 Perforation 4996.00 4996.30 20
2018-08-27 Perforation 4976.00 4976.30 20
2018-08-27 Perforation 4956.00 4956.30 20
2018-08-27 Fracture 4956.00 4996.30 0
2018-08-27 Perforation 4936.00 4936.30 20
2018-08-24 Fracture 5736.00 5776.30 0
2018-08-27 Perforation 4916.00 4916.30 20
2018-08-27 Perforation 4896.00 4896.30 20
2018-08-27 Fracture 4896.00 4936.30 0
2018-08-27 Perforation 4876.00 4876.30 20
2018-08-27 Perforation 4856.00 4856.30 20
2018-08-27 Perforation 4836.00 4836.30 20
2018-08-27 Fracture 4836.00 4876.30 0
2018-08-27 Perforation 4816.00 4816.30 20
2018-08-27 Perforation 4796.00 4796.30 20
2018-08-27 Perforation 4776.00 4776.30 20
2018-08-24 Perforation 5716.00 5716.30 20
2018-08-27 Fracture 4776.00 4816.30 0
2018-08-28 Perforation 4756.00 4756.30 20
2018-08-28 Perforation 4736.00 4736.30 20
2018-08-28 Perforation 4716.00 4716.30 20
2018-08-28 Fracture 4716.00 4756.30 0
2018-08-28 Perforation 4696.00 4696.30 20
2018-08-28 Perforation 4676.00 4676.30 20
2018-08-28 Perforation 4656.00 4656.30 20
2018-08-28 Fracture 4656.00 4696.30 0
2018-08-28 Perforation 4636.00 4636.30 20
2018-08-24 Perforation 5696.00 5696.30 20
2018-08-28 Perforation 4616.00 4616.30 20
2018-08-28 Perforation 4596.00 4596.30 20
2018-08-28 Fracture 4596.00 4636.30 0
2018-08-28 Perforation 4576.00 4576.30 20
2018-08-28 Perforation 4556.00 4556.30 20
2018-08-28 Perforation 4536.00 4536.30 20
2018-08-28 Fracture 4536.00 4576.30 0
2018-08-29 Perforation 4516.00 4516.30 20
2018-08-29 Perforation 4496.00 4496.30 20
2018-08-29 Perforation 4476.00 4476.30 20
2018-08-24 Perforation 5676.00 5676.30 20
2018-08-29 Fracture 4476.00 4516.30 0
2018-08-29 Perforation 4456.00 4456.30 20
2018-08-29 Perforation 4436.00 4436.30 20
2018-08-29 Perforation 4416.00 4416.30 20
2018-08-29 Fracture 4416.00 4456.30 0
2018-08-29 Perforation 4396.00 4396.30 20
2018-08-29 Perforation 4376.00 4376.30 20
2018-08-29 Perforation 4356.00 4356.30 20
2018-08-29 Fracture 4356.00 4396.30 0
2018-08-29 Perforation 4336.00 4336.30 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-14 2018-09-03 2,774 30,450 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.7294 N/A
N2 7727-37-9 100 3.0206 N/A
water Not Available 100 48.7867 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 3.8736 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 5.0971 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 2.5592 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0729 N/A
dibromoacetonitrile 3252-43-5 100 0.0729 N/A
non-hazardous ingredients Not Available 100 0.0729 N/A
polyethylene glycol 25322-68-3 100 0.0729 N/A
sodium bromide 7647-15-6 100 0.0729 N/A
AI-12 Trican Corrosion Inhibitor 1-decanol 112-30-1 100 0.0027 N/A
1-octanol 111-87-5 100 0.0027 N/A
branched nonylphenol polyethylene glycol ether 127087-87-0 100 0.0027 N/A
cinnamaldehyde 104-55-2 100 0.0027 N/A
dipropylene glycol monomethyl ether 34590-94-8 100 0.0027 N/A
ethylene glycol 107-21-1 100 0.0027 N/A
formic acid 64-18-6 100 0.0027 N/A
isopropanol 67-63-0 100 0.0027 N/A
tar bases. quinoline derives 68513-87-1 100 0.0027 N/A
tar bases. quinoline derives.. benzyl chloride-quaternized 72480-70-7 100 0.0027 N/A
triethyl phosphate 78-40-0 100 0.0027 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0001 N/A
propylene glycol 57-55-6 100 0.0001 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0013 N/A
propylene glycol 57-55-6 100 0.0013 N/A
Bulk FR-23 Trican Friction Reducer acrylamide modified polymer 9972 100 0.6581 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.6581 N/A
non-hazardous ingredients Not Available 100 0.6581 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0063 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.1092 N/A
Bulk NMR-1 Trican Surfactant methanol 67-56-1 100 0.4808 N/A
non-hazardous ingredients Not Available 100 0.4808 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-09 2018-09-10 Surface Water - River 25514
2018-08-23 2018-08-27 Surface Water - Runoff 5937

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1721 0.0 0.0 0.0
2019 8671 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-27 No Incident Encountered 0.00 0.00
2018-10-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References