If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0606042102002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.176908,"lon":-118.541286,"icon":""}]} |
Location: 00/02-21-060-04W6/2 | |
Location Alias: 00/02-21-60-04 W6M | |
Location Alias 2: 00/02-21-060-04 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 6 | |
Range: 04 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: STRATH SMOKY 11-9-60-4 | |
Operator Name: Strath Resources Ltd. | |
License Number: 0436386 | |
License Date: 2011-08-29 | |
License Status: Amended | |
Spud Date: 2011-10-20 | |
Final Drill Date: 2011-12-16 | |
Well Total Depth: 4831.00 m | |
Surface Hole Latitude: 54.176908 | |
Surface Hole Longitude: -118.541286 |
Date | Event |
---|---|
2011-08-29 | Obtained License |
2011-11-04 | Direction Drilling Operation Performed - Horizontal |
2011-11-18 | Well Log Performed |
2011-11-19 | Intermediate Casing Operation Performed |
2011-11-19 | Well Log Performed |
2011-11-20 | Well Log Performed |
2011-12-16 | Finished Drilling |
2011-12-16 | Well Log Performed |
2011-12-16 | Well Mode changed to Drilled and Cased |
2011-12-22 | Liner Casing Operation Performed |
2011-12-24 | Rig Released |
2012-08-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-23 | Well Began Production |
2013-01-23 | Well Fluid changed to Gas |
2013-01-23 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-04 | 1782.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-06 | Multi-Stage Fracture | 4815.70 | 4816.50 | 0 |
2012-08-13 | Multi-Stage Fracture | 3754.90 | 3755.70 | 0 |
2012-08-13 | Multi-Stage Fracture | 3655.60 | 3656.40 | 0 |
2012-08-15 | Multi-Stage Fracture | 3556.00 | 3556.80 | 0 |
2012-08-15 | Multi-Stage Fracture | 3456.70 | 3457.50 | 0 |
2012-08-16 | Multi-Stage Fracture | 3343.90 | 3344.70 | 0 |
2012-08-16 | Multi-Stage Fracture | 3258.00 | 3258.80 | 0 |
2012-08-16 | Multi-Stage Fracture | 3158.40 | 3159.20 | 0 |
2012-08-16 | Multi-Stage Fracture | 3059.10 | 3059.90 | 0 |
2012-08-16 | Multi-Stage Fracture | 2946.10 | 2946.90 | 0 |
2012-08-09 | Multi-Stage Fracture | 4664.40 | 4665.20 | 0 |
2012-08-09 | Multi-Stage Fracture | 4564.90 | 4565.70 | 0 |
2012-08-10 | Multi-Stage Fracture | 4465.30 | 4466.10 | 0 |
2012-08-10 | Multi-Stage Fracture | 4365.70 | 4366.50 | 0 |
2012-08-10 | Multi-Stage Fracture | 4266.20 | 4267.00 | 0 |
2012-08-10 | Multi-Stage Fracture | 4166.60 | 4167.40 | 0 |
2012-08-11 | Multi-Stage Fracture | 3954.00 | 3954.80 | 0 |
2012-08-12 | Multi-Stage Fracture | 3854.40 | 3855.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 8098 | 0.0 | 0.0 | 0.0 |
2014 | 5502 | 0.0 | 0.0 | 0.0 |
2015 | 7007 | 0.0 | 0.0 | 0.0 |
2016 | 5833 | 0.0 | 0.0 | 0.0 |
2017 | 7040 | 0.0 | 0.0 | 0.0 |
2018 | 7330 | 0.0 | 0.0 | 0.0 |
2019 | 8308 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]