X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606042102002

Well Details

Well ID: 0606042102002
Loading map...
Location: 00/02-21-060-04W6/2
Location Alias: 00/02-21-60-04 W6M
Location Alias 2: 00/02-21-060-04 W6/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 04
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH SMOKY 11-9-60-4
Operator Name: Strath Resources Ltd.
License Number: 0436386
License Date: 2011-08-29
License Status: Amended
Spud Date: 2011-10-20
Final Drill Date: 2011-12-16
Well Total Depth: 4831.00 m
Surface Hole Latitude: 54.176908
Surface Hole Longitude: -118.541286

For data sources see[1][2]

Well History

Date Event
2011-08-29 Obtained License
2011-11-04 Direction Drilling Operation Performed - Horizontal
2011-11-18 Well Log Performed
2011-11-19 Intermediate Casing Operation Performed
2011-11-19 Well Log Performed
2011-11-20 Well Log Performed
2011-12-16 Finished Drilling
2011-12-16 Well Log Performed
2011-12-16 Well Mode changed to Drilled and Cased
2011-12-22 Liner Casing Operation Performed
2011-12-24 Rig Released
2012-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-23 Well Began Production
2013-01-23 Well Fluid changed to Gas
2013-01-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-04 1782.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-06 Multi-Stage Fracture 4815.70 4816.50 0
2012-08-13 Multi-Stage Fracture 3754.90 3755.70 0
2012-08-13 Multi-Stage Fracture 3655.60 3656.40 0
2012-08-15 Multi-Stage Fracture 3556.00 3556.80 0
2012-08-15 Multi-Stage Fracture 3456.70 3457.50 0
2012-08-16 Multi-Stage Fracture 3343.90 3344.70 0
2012-08-16 Multi-Stage Fracture 3258.00 3258.80 0
2012-08-16 Multi-Stage Fracture 3158.40 3159.20 0
2012-08-16 Multi-Stage Fracture 3059.10 3059.90 0
2012-08-16 Multi-Stage Fracture 2946.10 2946.90 0
2012-08-09 Multi-Stage Fracture 4664.40 4665.20 0
2012-08-09 Multi-Stage Fracture 4564.90 4565.70 0
2012-08-10 Multi-Stage Fracture 4465.30 4466.10 0
2012-08-10 Multi-Stage Fracture 4365.70 4366.50 0
2012-08-10 Multi-Stage Fracture 4266.20 4267.00 0
2012-08-10 Multi-Stage Fracture 4166.60 4167.40 0
2012-08-11 Multi-Stage Fracture 3954.00 3954.80 0
2012-08-12 Multi-Stage Fracture 3854.40 3855.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 8098 0.0 0.0 0.0
2014 5502 0.0 0.0 0.0
2015 7007 0.0 0.0 0.0
2016 5833 0.0 0.0 0.0
2017 7040 0.0 0.0 0.0
2018 7330 0.0 0.0 0.0
2019 8308 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References