X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614233403042

Well Details

Well ID: 0614233403042
Loading map...
Location: 04/03-34-061-23W4/2
Location Alias: 04/03-34-61-23 W4M
Location Alias 2: 04/03-34-061-23 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 23
Section: 34
County/Municipality: Westlock County
Well Name: Canlin ABEE 3-34-61-23
Operator Name: Canlin Energy Corporation
License Number: 0221629
License Date: 1999-02-19
License Status: Amended
Spud Date: 1999-03-01
Final Drill Date: 1999-03-03
Well Total Depth: 837.80 m
Surface Hole Latitude: 54.315275
Surface Hole Longitude: -113.367191

For data sources see[1][2]

Well History

Date Event
1999-02-19 Obtained License
1999-03-02 Surface Casing Operation Performed
1999-03-03 Finished Drilling
1999-03-03 Well Log Performed
1999-03-03 Well Mode changed to Drilled and Cased
1999-03-04 Production Casing Operation Performed
1999-03-04 Rig Released
1999-03-04 Well Log Performed
1999-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-12 Perforation Treatment Performed - Open-Hole Completion
1999-03-12 Plug Back Performed
1999-03-12 Well Log Performed
1999-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-13 Perforation Treatment Performed - Jet Perforation
1999-03-13 Plug Back Performed
1999-03-14 Perforation Treatment Performed - Jet Perforation
2000-03-22 Perforation Treatment Performed - Jet Perforation
2000-03-22 Well Began Production
2000-03-22 Well Fluid changed to Gas
2000-03-22 Well Log Performed
2000-03-22 Well Mode changed to Flowing
2000-03-23 Perforation Treatment Performed - Jet Perforation
2000-03-23 Well Log Performed
2019-11-21 Well Fluid changed to Gas
2019-11-21 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-12 Open Hole/Barefoot Completion 831.50 837.80 0
2000-03-23 Perforation 635.00 637.00 13
2000-03-23 Perforation 640.00 642.00 13
1999-03-12 Packing Device Capped w/Cement 807.00 815.00 0
1999-03-13 Perforation 786.50 788.50 20
1999-03-13 Perforation 789.00 791.00 20
1999-03-13 Perforation 791.50 793.50 20
1999-03-13 Packing Device Capped w/Cement 775.00 783.00 0
1999-03-14 Perforation 188.00 189.50 20
1999-03-14 Perforation 190.50 191.00 20
2000-03-22 Perforation 636.00 639.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6683 0.0 0.0 0.0
2001 8620 0.0 0.0 0.0
2002 8721 0.0 0.0 0.0
2003 8486 0.0 0.0 0.0
2004 8136 0.0 0.0 0.0
2005 8577 0.0 0.0 0.0
2006 8723 0.0 0.0 0.0
2007 8724 0.0 0.0 0.0
2008 8309 0.0 0.0 0.0
2009 8097 0.0 0.0 0.0
2010 8394 0.0 0.0 0.0
2011 8362 0.0 0.0 0.0
2012 8472 0.0 0.0 0.0
2013 8674 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8520 0.0 0.0 0.0
2016 3228 0.0 0.0 0.0
2017 8661 0.0 0.0 0.0
2018 1587 0.0 0.0 0.0

For data sources see[5]

References