X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614243308002

Well Details

Well ID: 0614243308002
Loading map...
Location: 00/08-33-061-24W4/2
Location Alias: 00/08-33-61-24 W4M
Location Alias 2: 00/08-33-061-24 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 24
Section: 33
County/Municipality: Westlock County
Well Name: CNRL ROCHSTR 8-33-61-24
Operator Name: Canadian Natural Resources Limited
License Number: 0176730
License Date: 1995-03-08
License Status: Issued
Spud Date: 1995-07-14
Final Drill Date: 1995-07-17
Well Total Depth: 857.00 m
Surface Hole Latitude: 54.316777
Surface Hole Longitude: -113.530952

For data sources see[1][2]

Well History

Date Event
1995-03-08 Obtained License
1995-07-15 Surface Casing Operation Performed
1995-07-17 Finished Drilling
1995-07-17 Well Log Performed
1995-07-17 Well Mode changed to Drilled and Cased
1995-07-18 Production Casing Operation Performed
1995-07-18 Rig Released
1995-08-22 Perforation Treatment Performed - Open-Hole Completion
1995-08-23 Perforation Treatment Performed - Jet Perforation
1996-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-07 Perforation Treatment Performed - Jet Perforation
1996-02-07 Plug Back Performed
1996-02-08 Perforation Treatment Performed - Jet Perforation
1996-02-08 Well Began Production
1996-02-08 Well Fluid changed to Gas
1996-02-08 Well Mode changed to Flowing
2014-05-20 Well Fluid changed to Gas
2014-05-20 Well Mode changed to Suspended
2014-10-23 Well Fluid changed to Gas
2014-10-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-22 Open Hole/Barefoot Completion 855.00 857.00 0
1995-08-23 Perforation 848.00 849.00 13
1996-02-07 Packing Device Capped w/Cement 850.50 853.50 0
1996-02-07 Packing Device Capped w/Cement 844.00 847.00 0
1996-02-07 Perforation 841.00 842.00 13
1996-02-07 Packing Device Capped w/Cement 832.00 840.00 0
1996-02-07 Perforation 810.50 811.30 13
1996-02-07 Packing Device Capped w/Cement 801.00 809.00 0
1996-02-08 Perforation 774.50 776.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 7798 0.0 0.0 0.0
1997 8555 0.0 0.0 0.0
1998 8290 0.0 0.0 0.0
1999 8631 0.0 0.0 0.0
2000 8458 0.0 0.0 0.0
2001 8565 0.0 0.0 0.0
2002 8667 0.0 0.0 0.0
2003 8716 0.0 0.0 0.0
2004 8733 0.0 0.0 0.0
2005 8704 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8525 0.0 0.0 0.0
2009 8509 0.0 0.0 0.0
2010 8394 0.0 0.0 0.0
2011 8247 0.0 0.0 0.0
2012 8594 0.0 0.0 0.0
2013 7048 0.0 0.0 0.0
2014 1070 0.0 0.0 0.0
2015 8542 0.0 0.0 0.0
2016 5624 0.0 0.0 0.0
2017 7796 0.0 0.0 0.0
2018 8698 0.0 0.0 0.0
2019 8642 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[5]

References