If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615200212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.234763,"lon":-116.893128,"icon":""}]} |
Location: 00/12-02-061-20W5/0 | |
Location Alias: 00/12-02-61-20 W5M | |
Location Alias 2: 00/12-02-061-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 20 | |
Section: 02 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: XTO G04 KAYBOBS 12-2-61-20 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0489498 | |
License Date: 2018-06-07 | |
License Status: Amended | |
Spud Date: 2018-12-03 | |
Final Drill Date: 2019-05-31 | |
Well Total Depth: 4889.50 m | |
Surface Hole Latitude: 54.234763 | |
Surface Hole Longitude: -116.893128 |
Date | Event |
---|---|
2018-06-07 | Obtained License |
2018-12-03 | Surface Casing Operation Performed |
2019-01-31 | Direction Drilling Operation Performed - Deviate |
2019-02-07 | Intermediate Casing Operation Performed |
2019-05-26 | Drill To LD |
2019-05-28 | Direction Drilling Operation Performed - Horizontal |
2019-05-31 | Finished Drilling |
2019-05-31 | Well Mode changed to Drilled and Cased |
2019-06-03 | Production Casing Operation Performed |
2019-06-06 | Rig Released |
2019-10-01 | Well Fluid changed to Gas |
2019-10-01 | Well Mode changed to Testing |
2019-11-30 | Well Fluid changed to Gas |
2019-11-30 | Well Mode changed to Test Completed |
2019-12-01 | Well Began Production |
2019-12-01 | Well Fluid changed to Gas |
2019-12-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-12-03 | Trinidad Drilling Ltd. | 56 | N/A | Set Surface |
2019-05-26 | Trinidad Drilling Ltd. | 56 | Drill To LD | |
2019-01-31 | Trinidad Drilling Ltd. | 56 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-01-31 | 686.90 | Deviate (5 - 79 degrees) |
2019-05-28 | 3440.10 | Horizontal |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-10-03 | 2019-10-21 | 3,319 | 31,224 | N/A |
2 | 2019-10-03 | 2019-10-16 | 3,319 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric acid | 7647-01-0 | 100 | 0.3673 | N/A | |||
Water | 7732-18-5 | 100 | 48.7649 | N/A | ||||
100 Mesh | Halliburton | Crystalline silica. quartz | 14808-60-7 | 100 | 0.5191 | N/A | ||
40/70 Premium | Halliburton | Crystalline silica. quartz | 14808-60-7 | 100 | 10.298 | N/A | ||
MC B-8510 | Mutli-Chem | Bactericide/Biocide | 2.2 Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0093 | N/A | |
2.2-Dibromomalonamide | 73003-80-2 | 100 | 0.0093 | N/A | ||||
2-Monobromo-3-nitrilopropionamide | 1113-55-9 | 100 | 0.0093 | N/A | ||||
Dibromoacetonitrile | 3252-43-5 | 100 | 0.0093 | N/A | ||||
Inert Ingredient(s) | Not Available | 100 | 0.0093 | N/A | ||||
FightR EC-1 | Halliburton | Friction Reducer | Inert Ingredient(s) | Not Available | 100 | 0.0535 | N/A | |
2 | FDP-S1346-18 | Halliburton | Friction Reducer | Inert Ingredient(s) | Not Available | 100 | 0.0452 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-09-29 | 2019-10-20 | Surface Water - River | 31872 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[8]