X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616063401020

Well Details

Well ID: 0616063401020
Loading map...
Location: 02/01-34-061-06W6/0
Location Alias: 02/01-34-61-06 W6M
Location Alias 2: 02/01-34-061-06 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST HZ 02 KAKWA 1-34-61-6
Operator Name: Harvest Operations Corp.
License Number: 0465796
License Date: 2014-03-17
License Status: Issued
Spud Date: 2014-11-22
Final Drill Date: 2014-12-23
Well Total Depth: 4717.00 m
Surface Hole Latitude: 54.319807
Surface Hole Longitude: -118.826763

For data sources see[1][2]

Well History

Date Event
2014-03-17 Obtained License
2014-11-22 Lost Circulation Occurred
2014-11-25 Surface Casing Operation Performed
2014-11-27 Well Log Performed
2014-12-04 Direction Drilling Operation Performed - Deviate
2014-12-07 Intermediate Casing Operation Performed
2014-12-13 Direction Drilling Operation Performed - Horizontal
2014-12-23 Finished Drilling
2014-12-23 Well Log Performed
2014-12-23 Well Mode changed to Drilled and Cased
2014-12-26 Perforation Treatment Performed - Open-Hole Completion
2014-12-26 Production Casing Operation Performed
2014-12-28 Rig Released
2015-02-28 Well Log Performed
2015-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-15 Well Began Production
2015-03-15 Well Fluid changed to Gas
2015-03-15 Well Mode changed to Flowing
2020-01-01 Well Fluid changed to Gas
2020-01-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-22 Precision Drilling Corporation 622 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-12-04 2722.20 Deviate (5 - 79 degrees)
2014-12-13 3147.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-26 Open Hole/Barefoot Completion 4711.00 4717.00 0
2015-03-07 Multi-Stage Fracture 4089.90 4090.00 0
2015-03-07 Multi-Stage Fracture 4029.10 4029.20 0
2015-03-07 Multi-Stage Fracture 3954.80 3954.90 0
2015-03-07 Multi-Stage Fracture 3894.10 3894.20 0
2015-03-07 Multi-Stage Fracture 3833.20 3833.30 0
2015-03-07 Multi-Stage Fracture 3772.40 3772.50 0
2015-03-07 Multi-Stage Fracture 3711.70 3711.80 0
2015-03-07 Multi-Stage Fracture 3651.00 3651.10 0
2015-03-07 Multi-Stage Fracture 3590.20 3590.30 0
2015-03-07 Multi-Stage Fracture 3529.40 3529.50 0
2015-03-06 Multi-Stage Fracture 4673.70 4673.80 0
2015-03-07 Multi-Stage Fracture 3468.50 3468.60 0
2015-03-07 Multi-Stage Fracture 3421.40 3421.50 0
2015-03-06 Multi-Stage Fracture 4582.50 4582.60 0
2015-03-06 Multi-Stage Fracture 4508.10 4508.20 0
2015-03-06 Multi-Stage Fracture 4433.70 4433.80 0
2015-03-06 Multi-Stage Fracture 4359.30 4359.40 0
2015-03-07 Multi-Stage Fracture 4298.50 4298.60 0
2015-03-07 Multi-Stage Fracture 4225.20 4225.30 0
2015-03-07 Multi-Stage Fracture 4164.40 4164.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-06 2015-03-07 3,011 5,241 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.7626 N/A
30/50 Atlas CRC Calfrac Hexamethylenetetramine 100-97-0 100 3.2206 N/A
Phenolic Resin 9003-35-4 100 3.2206 N/A
Quartz (SiO2) 14808-60-7 100 3.2206 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 14.1889 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0116 N/A
Water 7732-18-5 100 0.012 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0747 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.0801 N/A
Isopropanol 67-63-0 100 0.0805 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0801 N/A
Triethylene glycol 112-27-6 100 0.0805 N/A
Water 7732-18-5 100 0.0803 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 0.8842 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0891 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-06 2015-01-09 Surface Water - River 5241

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3384 0.0 0.0 0.0
2016 8373 0.0 0.0 0.0
2017 8629 0.0 0.0 0.0
2018 8594 0.0 0.0 0.0
2019 8545 0.0 0.0 0.0
2020 1334 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-22 Lost Circulation 48.00 153.00
2015-03-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References