X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625182412000

Well Details

Well ID: 0625182412000
Loading map...
Location: 00/12-24-062-18W5/0
Location Alias: 00/12-24-62-18 W5M
Location Alias 2: 00/12-24-062-18 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 18
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC FOXCK 12-24-62-18
Operator Name: XTO Energy Canada ULC
License Number: 0123183
License Date: 1986-05-27
License Status: Suspension
Spud Date: 1986-07-04
Final Drill Date: 1986-08-16
Well Total Depth: 3118.00 m
Surface Hole Latitude: 54.379217
Surface Hole Longitude: -116.574143

For data sources see[1][2]

Well History

Date Event
1986-05-27 Obtained License
1986-07-05 Lost Circulation Occurred
1986-07-09 Surface Casing Operation Performed
1986-08-07 Well Log Performed
1986-08-12 Well Log Performed
1986-08-15 Drill Stem Test Performed
1986-08-16 Finished Drilling
1986-08-16 Well Mode changed to Drilled and Cased
1986-08-18 Production Casing Operation Performed
1986-08-18 Rig Released
1986-09-11 Perforation Treatment Performed - Jet Perforation
1986-09-12 Perforation Treatment Performed - Fractured
1986-09-14 Well Began Production
1986-09-14 Well Fluid changed to Crude Oil
1986-09-14 Well Mode changed to Flowing
1986-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-24 Perforation Treatment Performed - Jet Perforation
1986-09-30 Well Fluid changed to Crude Oil
1986-09-30 Well Mode changed to Suspended
1987-03-04 Well Fluid changed to Crude Oil
1987-03-04 Well Mode changed to Flowing
1993-12-07 Well Log Performed
1994-04-10 Well Log Performed
1995-06-19 Well Fluid changed to Crude Oil
1995-06-19 Well Mode changed to Pumping
1995-10-20 Well Log Performed
2002-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-02 Plug Back Performed
2002-10-02 Well Fluid changed to Crude Oil
2002-10-02 Well Mode changed to Abandoned and Whipstocked
2002-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-03 Well Log Performed
2009-11-21 Well Log Performed
2010-01-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-11 Perforation 3033.50 3038.50 13
1986-09-11 Perforation 3042.00 3044.00 13
1986-09-11 Perforation 3049.00 3057.00 13
1986-09-12 Fracture 3033.50 3057.00 0
1986-09-24 Perforation 3069.00 3072.00 13
1986-09-24 Acid Treatment 3033.50 3072.00 0
2002-10-02 Packing Device Capped w/Cement 3017.00 3025.00 0
2002-10-05 Packing Device Capped w/Cement 738.00 797.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 193 0.0 0.0 0.0
1987 6687 0.0 0.0 0.0
1988 5390 0.0 0.0 0.0
1989 2091 0.0 0.0 0.0
1990 1845 0.0 0.0 0.0
1991 3388 0.0 0.0 0.0
1992 4755 0.0 0.0 0.0
1993 5760 0.0 0.0 0.0
1994 8391 0.0 0.0 0.0
1995 7349 0.0 0.0 0.0
1996 3039 0.0 0.0 0.0
1997 2453 0.0 0.0 0.0
1998 7579 0.0 0.0 0.0
1999 1338 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-07-05 Lost Circulation 60.70 195.00

For data sources see[6]

References