X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625231204000

Well Details

Well ID: 0625231204000
Loading map...
Location: 00/04-12-062-23W5/0
Location Alias: 00/04-12-62-23 W5M
Location Alias 2: 00/04-12-062-23 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 23
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: AOSC HZ GRIZZLY 4-12-62-23
Operator Name: Athabasca Oil Corporation
License Number: 0437599
License Date: 2011-10-11
License Status: Amended
Spud Date: 2012-07-13
Final Drill Date: 2012-08-06
Well Total Depth: 3816.00 m
Surface Hole Latitude: 54.354761
Surface Hole Longitude: -117.323349

For data sources see[1][2]

Well History

Date Event
2011-10-11 Obtained License
2012-07-15 Surface Casing Operation Performed
2012-07-20 Direction Drilling Operation Performed - Deviate
2012-07-26 Direction Drilling Operation Performed - Horizontal
2012-08-06 Finished Drilling
2012-08-06 Well Mode changed to Drilled and Cased
2012-08-11 Production Casing Operation Performed
2012-08-11 Well Log Performed
2012-08-13 Rig Released
2012-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-28 Well Began Production
2012-09-28 Well Fluid changed to Gas
2012-09-28 Well Mode changed to Flowing
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-13 Nabors Drilling Limited 82 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-20 2150.90 Deviate (5 - 79 degrees)
2012-07-26 2552.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-26 Multi-Stage Fracture 3761.40 3761.50 0
2012-09-27 Multi-Stage Fracture 3010.20 3010.30 0
2012-09-27 Multi-Stage Fracture 2926.80 2926.90 0
2012-09-27 Multi-Stage Fracture 2843.10 2843.20 0
2012-09-27 Multi-Stage Fracture 2759.70 2759.80 0
2012-09-27 Multi-Stage Fracture 2677.10 2677.20 0
2012-09-27 Multi-Stage Fracture 2606.00 2606.10 0
2012-09-26 Multi-Stage Fracture 3679.40 3679.50 0
2012-09-26 Multi-Stage Fracture 3595.40 3595.50 0
2012-09-26 Multi-Stage Fracture 3511.60 3511.70 0
2012-09-27 Multi-Stage Fracture 3428.00 3428.10 0
2012-09-27 Multi-Stage Fracture 3344.40 3344.50 0
2012-09-27 Multi-Stage Fracture 3260.70 3260.80 0
2012-09-27 Multi-Stage Fracture 3177.00 3177.10 0
2012-09-27 Multi-Stage Fracture 3093.50 3093.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 435 0.0 0.0 0.0
2013 5831 0.0 0.0 0.0
2014 7178 0.0 0.0 0.0
2015 7730 0.0 0.0 0.0
2016 8159 0.0 0.0 0.0
2017 7590 0.0 0.0 0.0
2018 7123 0.0 0.0 0.0
2019 8632 0.0 0.0 0.0
2020 1942 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-12 No Incident Encountered 0.00 0.00
2012-10-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References