X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626031816040

Well Details

Well ID: 0626031816040
Loading map...
Location: 04/16-18-062-03W6/0
Location Alias: 04/16-18-62-03 W6M
Location Alias 2: 04/16-18-062-03 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 03
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ 104 KAKWA 16-18-62-3
Operator Name: Strath Resources Ltd.
License Number: 0488387
License Date: 2018-02-26
License Status: Issued
Spud Date: 2018-03-17
Final Drill Date: 2018-06-15
Well Total Depth: 5969.00 m
Surface Hole Latitude: 54.345165
Surface Hole Longitude: -118.431739

For data sources see[1][2]

Well History

Date Event
2018-02-26 Obtained License
2018-03-18 Surface Casing Operation Performed
2018-03-23 Direction Drilling Operation Performed - Deviate
2018-04-03 Intermediate Casing Operation Performed
2018-05-31 Direction Drilling Operation Performed - Horizontal
2018-05-31 Well Log Performed
2018-06-15 Finished Drilling
2018-06-15 Well Log Performed
2018-06-15 Well Mode changed to Drilled and Cased
2018-06-17 Liner Casing Operation Performed
2018-06-19 Rig Released
2018-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Well Began Production
2018-09-01 Well Fluid changed to Gas
2018-09-01 Well Mode changed to Flowing
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-22 Well Log Performed
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-03-17 Precision Drilling Corporation 543 N/A Drill To LD
2018-05-30 Precision Drilling Corporation 543 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-23 2308.40 Deviate (5 - 79 degrees)
2018-05-31 3315.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-07 Multi-Stage Fracture 5869.00 5893.00 0
2018-08-28 Multi-Stage Fracture 5437.00 5461.00 0
2018-08-29 Multi-Stage Fracture 5389.00 5413.00 0
2018-08-29 Multi-Stage Fracture 5341.00 5365.00 0
2018-08-29 Multi-Stage Fracture 5293.00 5317.00 0
2018-08-29 Multi-Stage Fracture 5245.00 5269.00 0
2018-08-29 Multi-Stage Fracture 5197.00 5221.00 0
2018-08-30 Multi-Stage Fracture 5149.00 5173.00 0
2018-08-30 Multi-Stage Fracture 5101.00 5125.00 0
2018-08-30 Multi-Stage Fracture 5053.00 5077.00 0
2018-08-30 Multi-Stage Fracture 5005.00 5029.00 0
2018-08-26 Multi-Stage Fracture 5821.00 5845.00 0
2018-08-30 Multi-Stage Fracture 4957.00 4981.00 0
2018-08-31 Multi-Stage Fracture 4909.00 4933.00 0
2018-08-31 Multi-Stage Fracture 4861.00 4885.00 0
2018-08-31 Multi-Stage Fracture 4813.00 4837.00 0
2018-08-31 Multi-Stage Fracture 4765.00 4789.00 0
2018-09-01 Multi-Stage Fracture 4717.00 4741.00 0
2018-09-01 Multi-Stage Fracture 4669.00 4693.00 0
2018-09-01 Multi-Stage Fracture 4621.00 4645.00 0
2018-09-01 Multi-Stage Fracture 4573.00 4597.00 0
2018-09-01 Multi-Stage Fracture 4525.00 4549.00 0
2018-08-27 Multi-Stage Fracture 5773.00 5797.00 0
2018-09-02 Multi-Stage Fracture 4477.00 4501.00 0
2018-09-03 Multi-Stage Fracture 4429.00 4453.00 0
2018-09-03 Multi-Stage Fracture 4381.00 4405.00 0
2018-09-03 Multi-Stage Fracture 4333.00 4357.00 0
2018-09-03 Multi-Stage Fracture 4285.00 4309.00 0
2018-09-03 Multi-Stage Fracture 4237.00 4261.00 0
2018-09-04 Multi-Stage Fracture 4189.00 4213.00 0
2018-09-04 Multi-Stage Fracture 4141.00 4165.00 0
2018-09-04 Multi-Stage Fracture 4093.00 4117.00 0
2018-09-04 Multi-Stage Fracture 4045.00 4069.00 0
2018-08-27 Multi-Stage Fracture 5725.00 5749.00 0
2018-09-04 Multi-Stage Fracture 3997.00 4021.00 0
2018-09-05 Multi-Stage Fracture 3949.00 3973.00 0
2018-09-05 Multi-Stage Fracture 3901.00 3925.00 0
2018-09-05 Multi-Stage Fracture 3853.00 3877.00 0
2018-09-05 Multi-Stage Fracture 3805.00 3829.00 0
2018-09-05 Multi-Stage Fracture 3757.00 3781.00 0
2018-09-05 Multi-Stage Fracture 3709.00 3733.00 0
2018-09-06 Multi-Stage Fracture 3661.00 3685.00 0
2018-09-06 Multi-Stage Fracture 3613.00 3637.00 0
2018-09-06 Multi-Stage Fracture 3565.00 3589.00 0
2018-08-27 Multi-Stage Fracture 5677.00 5701.00 0
2018-09-06 Multi-Stage Fracture 3517.00 3541.00 0
2018-09-06 Multi-Stage Fracture 3469.00 3493.00 0
2018-09-07 Multi-Stage Fracture 3421.00 3445.00 0
2018-09-07 Multi-Stage Fracture 3373.00 3397.00 0
2018-09-07 Multi-Stage Fracture 3325.00 3349.00 0
2018-08-27 Multi-Stage Fracture 5629.00 5653.00 0
2018-08-28 Multi-Stage Fracture 5581.00 5605.00 0
2018-08-28 Multi-Stage Fracture 5533.00 5557.00 0
2018-08-28 Multi-Stage Fracture 5485.00 5509.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-07 2018-09-07 3,209 53,167 N/A
2 2018-08-26 2018-09-07 3,209 0 N/A
3 2018-08-07 2018-08-07 3,209 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 89.4734 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 8.2487 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.7114 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.7226 N/A
Water 7732-18-5 100 0.7226 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0112 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0112 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0112 N/A
Polyethylene glycol 25322-68-3 100 0.0112 N/A
Sodium bromide 7647-15-6 100 0.0112 N/A
DynaScale 3515 Calfrac Well Services Scale Inhibitor Methanol 67-56-1 100 0.0142 N/A
Non-Hazardous Trade Secret 100 0.0142 N/A
CalSurf 9400 Calfrac Surfactant Ethoxylated Alcohols Trade Secret 100 0.0197 N/A
Methanol 67-56-1 100 0.0197 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0197 N/A
2 DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0436 N/A
Water 7732-18-5 100 0.0436 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.2491 N/A
3 DynaRate 6104 Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0563 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0563 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0563 N/A
Oleamide Trade Secret 100 0.0563 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-07 2018-09-08 Central Water Distribution Facility 54269

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2062 0.0 0.0 0.0
2019 8311 0.0 0.0 0.0
2020 2148 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-19 No Incident Encountered 0.00 0.00
2018-09-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References