X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626033401005

Well Details

Well ID: 0626033401005
Loading map...
Location: 00/01-34-062-03W6/5
Location Alias: 00/01-34-62-03 W6M
Location Alias 2: 00/01-34-062-03 W6/05
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 03
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC RE-EN HZ LATOR 1-34-62-3
Operator Name: XTO Energy Canada ULC
License Number: 0358264
License Date: 2006-06-02
License Status: Amended
Spud Date: 2011-10-27
Final Drill Date: 2011-11-16
Well Total Depth: 4145.00 m
Surface Hole Latitude: 54.403598
Surface Hole Longitude: -118.331420

For data sources see[1][2]

Well History

Date Event
2006-06-02 Obtained License
2011-10-27 Direction Drilling Operation Performed - Horizontal
2011-11-09 Direction Drilling Operation Performed - Horizontal
2011-11-16 Finished Drilling
2011-11-16 Well Log Performed
2011-11-16 Well Mode changed to Drilled and Cased
2011-11-17 Well Log Performed
2011-12-01 Liner Casing Operation Performed
2011-12-01 Perforation Treatment Performed - Open-Hole Completion
2011-12-02 Rig Released
2011-12-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-01 Well Fluid changed to Gas
2012-01-01 Well Mode changed to Testing
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Gas
2012-02-01 Well Mode changed to Flowing
2016-10-01 Well Fluid changed to Gas
2016-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-27 2474.80 Horizontal
2011-11-09 3365.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-01 Open Hole/Barefoot Completion 4140.00 4145.00 0
2011-12-30 Multi-Stage Fracture 3224.80 3225.60 0
2011-12-30 Multi-Stage Fracture 3103.60 3104.40 0
2011-12-30 Multi-Stage Fracture 2972.70 2973.50 0
2011-12-30 Multi-Stage Fracture 2830.00 2830.80 0
2011-12-31 Multi-Stage Fracture 2676.90 2677.60 0
2011-12-31 Multi-Stage Fracture 2612.40 2613.20 0
2011-12-28 Multi-Stage Fracture 4125.20 4126.50 0
2011-12-28 Multi-Stage Fracture 4039.30 4040.00 0
2011-12-29 Multi-Stage Fracture 3925.60 3926.40 0
2011-12-29 Multi-Stage Fracture 3812.20 3812.90 0
2011-12-29 Multi-Stage Fracture 3698.80 3699.60 0
2011-12-29 Multi-Stage Fracture 3575.30 3576.00 0
2011-12-29 Multi-Stage Fracture 3471.70 3472.50 0
2011-12-30 Multi-Stage Fracture 3348.20 3349.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6054 0.0 0.0 0.0
2013 7334 0.0 0.0 0.0
2014 6382 0.0 0.0 0.0
2015 8109 0.0 0.0 0.0
2016 7388 0.0 0.0 0.0
2017 6072 0.0 0.0 0.0
2018 7236 0.0 0.0 0.0
2019 3508 0.0 0.0 0.0
2020 2 0.0 0.0 0.0

For data sources see[6]

References