X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635101712000

Well Details

Well ID: 0635101712000
Loading map...
Location: 00/12-17-063-10W5/0
Location Alias: 00/12-17-63-10 W5M
Location Alias 2: 00/12-17-063-10 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 10
Section: 17
County/Municipality: Woodlands County
Well Name: ACCEL JUDYCK 12-17-63-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0022413
License Date: 1962-05-16
License Status: Abandoned
Spud Date: 1962-07-08
Final Drill Date: 1962-07-27
Well Total Depth: 2650.50 m
Surface Hole Latitude: 54.452752
Surface Hole Longitude: -115.485353

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-05-16 Obtained License
1962-07-27 Finished Drilling
1962-07-27 Well Mode changed to Drilled and Cased
1962-07-28 Drill Stem Test Performed
1962-07-30 Production Casing Operation Performed
1962-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-17 Perforation Treatment Performed - Jet Perforation
1962-08-18 Well Began Production
1962-08-18 Well Fluid changed to Crude Oil
1962-08-18 Well Mode changed to Flowing
1970-03-19 Perforation Treatment Performed - Jet Perforation
1970-03-20 Well Began Injection
1970-03-20 Well Fluid changed to Water
1970-03-20 Well Type changed to Injection
1970-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1982-06-01 Well Fluid changed to Water
1982-06-01 Well Mode changed to Suspended
1982-06-01 Well Type changed to Injection
1984-12-12 Well Log Performed
1984-12-13 Perforation Treatment Performed - Jet Perforation
1984-12-14 Perforation Treatment Performed - Jet Perforation
1984-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-15 Well Log Performed
1987-11-02 Well Fluid changed to Water
1987-11-02 Well Type changed to Injection
1992-10-22 Well Fluid changed to Water
1992-10-22 Well Mode changed to Suspended
1992-10-22 Well Type changed to Injection
1996-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-31 Perforation Treatment Performed - Jet Perforation
1996-07-31 Plug Back Performed
1996-07-31 Well Log Performed
1996-08-21 Perforation Treatment Performed - Remedial Casing
1996-08-25 Well Abandoned
1996-08-25 Well Fluid changed to Water
1996-08-25 Well Mode changed to Abandoned
1996-08-25 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-08-17 Perforation 2624.90 2626.50 3
1996-07-31 Perforation 322.00 323.00 13
1996-08-21 Remedial Casing Cementing 322.00 323.00 0
1962-08-17 Acid Treatment 2624.90 2626.50 0
1970-03-19 Perforation 2626.50 2630.40 7
1970-03-21 Acid Wash 2626.50 2630.40 0
1984-12-13 Perforation 2629.20 2638.30 7
1984-12-13 Perforation 2625.50 2628.50 7
1984-12-14 Perforation 2617.00 2624.30 3
1984-12-15 Acid Treatment 2617.00 2638.30 0
1996-07-31 Packing Device Capped w/Cement 2570.00 2578.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 96 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0

For data sources see[5]

References