X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635232616000

Well Details

Well ID: 0635232616000
Loading map...
Location: 00/16-26-063-23W5/0
Location Alias: 00/16-26-63-23 W5M
Location Alias 2: 00/16-26-063-23 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 23
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ WAHIGAN 16-26-63-23
Operator Name: Tangle Creek Energy Ltd.
License Number: 0433618
License Date: 2011-05-18
License Status: Issued
Spud Date: 2011-07-06
Final Drill Date: 2011-07-30
Well Total Depth: 3669.00 m
Surface Hole Latitude: 54.485187
Surface Hole Longitude: -117.380203

For data sources see[1][2]

Well History

Date Event
2011-05-18 Obtained License
2011-07-06 Lost Circulation Occurred
2011-07-16 Surface Casing Operation Performed
2011-07-21 Direction Drilling Operation Performed - Horizontal
2011-07-24 Well Log Performed
2011-07-25 Intermediate Casing Operation Performed
2011-07-30 Finished Drilling
2011-07-30 Well Log Performed
2011-07-30 Well Mode changed to Drilled and Cased
2011-07-31 Liner Casing Operation Performed
2011-08-01 Rig Released
2011-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-20 Perforation Treatment Performed - Open-Hole Completion
2011-10-11 Well Began Production
2011-10-11 Well Fluid changed to Crude Oil
2011-10-11 Well Mode changed to Flowing
2011-11-26 Well Fluid changed to Crude Oil
2011-11-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-21 1921.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-20 Open Hole/Barefoot Completion 3664.00 3669.00 0
2011-08-20 Multi-Stage Fracture 2965.20 2965.30 0
2011-08-20 Multi-Stage Fracture 2882.60 2882.70 0
2011-08-20 Multi-Stage Fracture 2800.30 2800.40 0
2011-08-20 Multi-Stage Fracture 2717.60 2717.70 0
2011-08-20 Multi-Stage Fracture 2636.00 2636.10 0
2011-08-20 Multi-Stage Fracture 2553.30 2553.40 0
2011-08-20 Multi-Stage Fracture 2470.70 2470.80 0
2011-08-20 Multi-Stage Fracture 2389.10 2389.20 0
2011-08-20 Multi-Stage Fracture 3628.80 3628.90 0
2011-08-20 Multi-Stage Fracture 3539.20 3539.30 0
2011-08-20 Multi-Stage Fracture 3469.40 3469.50 0
2011-08-20 Multi-Stage Fracture 3387.40 3387.50 0
2011-08-20 Multi-Stage Fracture 3292.10 3292.20 0
2011-08-20 Multi-Stage Fracture 3210.30 3210.40 0
2011-08-20 Multi-Stage Fracture 3128.70 3128.80 0
2011-08-20 Multi-Stage Fracture 3048.10 3048.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1309 0.0 0.0 0.0
2012 8121 0.0 0.0 0.0
2013 8416 0.0 0.0 0.0
2014 8477 0.0 0.0 0.0
2015 8402 0.0 0.0 0.0
2016 5905 0.0 0.0 0.0
2017 6213 0.0 0.0 0.0
2018 4096 0.0 0.0 0.0
2019 5591 0.0 0.0 0.0
2020 485 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-07-06 Lost Circulation 109.00 109.00

For data sources see[7]

References